2011 2014 2021A 2024 Aluminum Round Tube/Pipe

China 2011 2014 2017A 2024 Aluminum Round Tube/Pipe, Find details about China Aluminum Tube, Aluminum Pipe from 2011 2014 2017A 2024 Aluminum Round Tube/Pipe

Model NO.
2011 2014 2017A 2024
Alloy
Alloy
Temper
T3 - T8
Length
6000mm or Customer Production
Supply Ability
16000 Tons Per Month
Al (Min)
98%
Standard
JIS, ASTM, DIN
Trademark
ruixin
Transport Package
Wooden Pallet
Specification
0.2-30mm
Origin
China
HS Code
7608100000
Model NO.
2011 2014 2017A 2024
Alloy
Alloy
Temper
T3 - T8
Length
6000mm or Customer Production
Supply Ability
16000 Tons Per Month
Al (Min)
98%
Standard
JIS, ASTM, DIN
Trademark
ruixin
Transport Package
Wooden Pallet
Specification
0.2-30mm
Origin
China
HS Code
7608100000

2011 2014 2017A 2024 Aluminum Round Tube/Pipe

Product Description:
2011 2014 2017A 2024 Aluminum Round Tube/Pipe
We supply Aluminum steel pipe of various specifications and materials, and provide customized services.
Specification:
Productaluminized steel pipe
standardJIS, ASTM, DIN
Models1050 1100 2014 2024 3002 3004 5052 5A02 5754 5086 5083 5A05 5A06 6061 6082 6063 7050 7075 8011
Surfacebright
Pipe Length6m can be customized according to the length requirements
Thickness of aluminized steel pipe0.5-50mm
End Protector Plastic caps 
 ApplicationAutomobile, motorcycle muffler, exhaust pipe, fuel tank.
Combustion furnace, heat exchanger, dryer, air conditioner, etc.
Domestic water heater, gas stove, bread box, chimney, microwave oven, food processing machinery, electric oven, cooker.
 TestChemical Component Analysis, Mechanical Properties, Technical Properties, Exterior Size
 Productivity 50000 tons per month
 Min Order5 tons
 Remark Special design available according to requirement
Packing&Delivery:
2011 2014 2017A 2024 Aluminum Round Tube/Pipe
2011 2014 2017A 2024 Aluminum Round Tube/Pipe
2011 2014 2017A 2024 Aluminum Round Tube/Pipe
Packing method: 1.Steel strip packaging 
                              2.According to customer requirement
Delivery cycle:Complete the delivery within 5-10 days after your payment.
About us:
2011 2014 2017A 2024 Aluminum Round Tube/PipeCertificate:
2011 2014 2017A 2024 Aluminum Round Tube/Pipe
We have cooperated with experienced shipping forwarders for many years, they arrange the shipment. No matter by express, by airor by sea, we will track the course of the goods all the way, to make sure goods arrive at you on time and in good condition.
Transportation and payment:
2011 2014 2017A 2024 Aluminum Round Tube/Pipe
We support sea transportation, air transportation, land transportation, international express and other transportation conditions.
2011 2014 2017A 2024 Aluminum Round Tube/Pipe
We support LC, TT, Western Union and other payment methods.
FAQ:
Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;
for products need special and rare materials,usually need 15-20 days to make shipment.

 
Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.

Q3: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow
up your case.


Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Airline and sea shipping also optional.
For mass products, ship freight is prefered.

 
Q5. Can you accept customize?
A: Yes. It can be customized as per the customers' request.