Bare All Aluminium Alloy Conductor AAAC1.Application
AAAC conductors are designed to get better strength to weight ratio and offer improved electrical properties, excellent sag-tension characteristics, and superior corrosion resistance when compared with ACSR. As compared to a conventional ACSR conductor, the lighter weight, comparable strength & current carrying capacity, lower electrical losses and superior corrosion resistance have given AAAC a wide acceptance in the distribution and medium & high voltage transmission lines.
2.Construction
AAAC are concentrically stranded and wrapped helically around a central wire. Each successive layer has six wires more than the previous underlying layer. Outer layer is right hand lay and reversed in successive layers.
3.Standard
BS EN 50183, ASTM B399, DIN 48201,IEC61089
4.Specification
Physical contents of aluminum alloy :
1. Resistivity - 0.0326 Ohms mm2/m at 20°C
2. Density - 2.70 kgm/dm3 at 20°C
3. Coefficient of Linear Expansion - 23 x 10-6 / °C
4. Constant Mass Temperature Coefficient (a) - 0.00360/ °C
5. Material - Heat treated Al. Mg. Si. Alloy
- Approximately 0.5% Mg & 0.5% Si
Standard: ASTM B399
Code Name | Area | Size & Stranding of ACSR with Equal Diameter | No. & Diameter of wires | Overall Diameter | Weight | Nominal Breaking Load |
Nominal | Actual |
MCM | mm2 | AWG or MCM | Al/Steel | mm | mm | kg/km | kN |
Akron | 30.58 | 15.48 | 6 | 6/1 | 7/1.68 | 5.04 | 42.7 | 4.92 |
Alton | 48.69 | 24.71 | 4 | 6/1 | 7/2.12 | 6.35 | 68.0 | 7.84 |
Ames | 77.47 | 39.22 | 2 | 6/1 | 7/2.67 | 8.02 | 108 | 12.45 |
Azusa | 123.3 | 62.38 | 1/0 | 6/1 | 7/3.37 | 10.11 | 172 | 18.97 |
Anaheim | 155.4 | 78.65 | 2/0 | 6/1 | 7/3.78 | 11.35 | 217 | 23.93 |
Amherst | 195.7 | 99.22 | 3/0 | 6/1 | 7/4.25 | 12.75 | 273 | 30.18 |
Alliance | 246.9 | 125.1 | 4/0 | 6/1 | 7/4.77 | 14.31 | 345 | 38.05 |
Butte | 312.8 | 158.6 | 266.8 | 26/7 | 19/3.26 | 16.30 | 437 | 48.76 |
Canton | 394.5 | 199.9 | 336.4 | 26/7 | 19/3.66 | 18.30 | 551 | 58.91 |
Cairo | 465.4 | 235.8 | 397.5 | 26/7 | 19/3.98 | 19.88 | 650 | 69.48 |
Darien | 559.5 | 283.5 | 477.0 | 26/7 | 19/4.36 | 21.79 | 781 | 83.52 |
Elgin | 652.4 | 330.6 | 556.5 | 26/7 | 19/4.71 | 23.54 | 911 | 97.42 |
Flint | 740.8 | 375.3 | 636.0 | 26/7 | 37/3.59 | 25.16 | 1035 | 108.21 |
Greely | 927.2 | 469.8 | 795.0 | 26/7 | 37/4.02 | 28.14 | 1295 | 135.47 |
5.About Us
People's Cable Group Co., Ltd. was founded in 2007, located in Zhengzhou Gongyi economic development zone. Our company has 2 factories (Zhitian factory and Zhulin factory), occupies total area of more than 300,000 square meters, with building area 230,000 square meters. The real capital assets more than USD 10 million , with total 500 staff members, 65 of which are professional and technical experts.
6.Certificate
As first rank of the cable supplier in China, we have obtained CCC, ISO9001, ISO14001, OHSAS certificates, passed the SGS and BV test, and our brand "RMJT" be given China famous brand.
7.Customer Visit
We have a professional sales team with each of them has engaged in this job for 3-10 years, so that we can provide the comprehensive and professional technology for you. With the perfect quality and after sales service, till now we have exported to more than 80 countries, welcome to visit us and establish win-win relationship!
8. FAQ
(1)When can I get the price?
We usually quote within 6 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your e-mail so that we will regard your inquiry priority.
(2)How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality. Sample is free, but the freight charge should be paid.
(3)How long can I expect to get the sample?
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 days. You can use your own express account or prepay us if you do not have an account.
(4)What about the lead time for mass production?
Honestly, it depends on the order quantity and the season you place the order. The best record we keep is delivering 10 kilometers cable within a week. Generally speaking, we suggest that you start inquiry two months before the date you would like to get the products at your country?
9. Contact us
People's Cable Group Co.,Ltd
Factory ADD:No.13th,YongDing Road, Goingyi,Zhengzhou city, Henan province, China.