Wireless Kwh 3 Phase RS485 Lora GSM Digital Electrical Meter

China Wireless Kwh 3 Phase RS485 Lora GSM Digital Electrical Meter, Find details about China Energy Meters, Smart Energy Meter from Wireless Kwh 3 Phase RS485 Lora GSM Digital Electrical Meter

Measured Signal
Continuous Wave
Type
Energy Meter
Certification
RoHS, ISO, CE
Customized
Customized
Trademark
HOP
Transport Package
Carton Packing
Specification
290 X170 X85(mm)
Origin
Sichuan China
Measured Signal
Continuous Wave
Type
Energy Meter
Certification
RoHS, ISO, CE
Customized
Customized
Trademark
HOP
Transport Package
Carton Packing
Specification
290 X170 X85(mm)
Origin
Sichuan China
Product Description

Wireless Kwh 3 Phase RS485 Lora GSM Digital Electrical Meter
Wireless Kwh 3 Phase RS485 Lora GSM Digital Electrical Meter
It is a smart energy manage meter with software platform for a total solution in smart buildings, factories, schools, hospital etc...
Built-in wireless communication modem (GPRS/3G/4G/NB-IoT/LoRa) can collect the energy data from the meter and transmit
remotely directly to the server platform for energy data analysis.

Product Parameters
Accuracy
active: 1.0, reactive: 2.0
Reference Voltage
3X220/380V
Normal Working Voltage
0.8Un~1.2Un
Extreme Working Voltage
0.7Un~1.3Un
Current
3 X 1.5(6)A, 3X5(60)A, 3X10(100)A
Frequency
50Hz±2.5Hz
Normal Working Temperature
-25ºC~60ºC 
Limit Working Temperature
-40ºC~70ºC
Clock Accuracy
≤0.5s/d(23ºC±2ºC)
Clock Battery Volume
 ≥ 1200mAh
Clock Battery Working Time
≥ 10 years
2.7Weight
2.7Kg
Dimension
290 X170 X85(mm)
Functions&Application
Wireless Kwh 3 Phase RS485 Lora GSM Digital Electrical MeterWith built-in wireless communication modem, gprs modem, the meter can transmit the energy data directly tothe server platform.
The communication modem is flexible and changeable according to the local network situation. Metering and transmission
two-in-one design is an excellent combination with advantages of cost saving, simple construction, quick deployment.

Functions

Wireless Kwh 3 Phase RS485 Lora GSM Digital Electrical Meter
1.Simple Construction:
Robust design with communication modem built in the meter.
2.Save cost:
Electricity meter + gateway two-in-one, no need external DTU device, no need RS485 wiring, saving equipment, materials and labor costs.
3.Data Storage Retrievable:
With great capacity, the GPRS modem can store energy data at least 2 months to avoid data loss in case of network gone.
4.Remotely upgradable:
The internal program of communication modem can be remotely upgraded, which is convenient for aftersales system maintenance.
5.Automatic reading without manual:
Remote reading of meter data through communication modem to reduce on-site labor costs.
6.Flexible Communication Selection:
The communication module can be selected according to the local network mode, for example, GPRS, 3G, 4G, and NB-IoT can be selected to achieve a matching network connection.
7.Two payment solutions available: pre-payment and post-payment.
Certifications

Wireless Kwh 3 Phase RS485 Lora GSM Digital Electrical Meter

FAQ
Q: Do you have APP for the energy meter?
A: Since different areas' clients have different using habit, so APP is always customized for clients according to the developing instructions clients give.
Q: Can the smart energy meter support wireless communication?
A: Yes, our wall mounted energy meter is with built-in communication modem; and din rail energy meter need to be connected to an external data collector/DTU with communication modem.
Q: Can you put our logo on the smart energy meter, DTU and software?
A: Yes, we can put your logo on the meter, data collector(concentrator) and system software.
Q: Can I confirm whether the communication is successful through the indicators light on the meter?
A: Yes. From the two status indicators of the meter, you can identify the communication status of the meter network; When the green light flashes, the communication module works normally.
Q: If the load of 100A needs to be switched off, can you achieve it with your electricity meter?
A: 100A load can be pulled, but the circuit breaker (outer pull) needs to be configured, and the 60A meter can be pulled by the internal relay breaker.