China 66kv to 500kv Different and Busbar Protection of Power Transformer, Find details about China Directional Overcurrent, Arc-Flash Detection from 66kv to 500kv Different and Busbar Protection of Power Transformer
RELAYS IED´S FEEDER | 69KV FEEDER PROTECITON REALY |
|
| |||||||||||
PROTECTIONS | OFFERED |
|
| |||||||||||
QUANTITY | 4 | YES |
|
|
| |||||||||
MOUNTING | INCLUDING WHERE CENL EP ESMERALDAS INDICATE | YES |
|
|
| |||||||||
LOW FREQUENCY | 81 | YES |
|
|
| |||||||||
OVERCURRENT; CURVES ANSI - IEC | 50/51 | YES |
|
|
| |||||||||
50N/51N | YES |
|
|
| ||||||||||
5OG / 51G | YES |
|
|
| ||||||||||
Breaker fault | 50 BF | YES |
|
|
| |||||||||
AUTORECLOSER | 79, MINIMUM 4 OPERATIONS | YES |
|
|
| |||||||||
COULD LOAD PICK UP |
| YES |
|
|
| |||||||||
DIRECTIONAL; FORWARD AND REVERSE | 67 | YES |
|
|
| |||||||||
ADJUSTMENT GROUPS | 3 | YES |
|
|
| |||||||||
LOW VOLTAGE | 27 | YES |
|
|
| |||||||||
SURGE | 59 | YES |
|
|
| |||||||||
HARMONIC | Restriction of harmonics | YES |
|
|
| |||||||||
HIGH IMPEDANCE FAULT | PROTECTION FAULT FROM LOW IMPEDANCE IN THE DISTRIBUTION LINES. | YES |
|
|
| |||||||||
MEASUREMENTS |
|
|
|
| ||||||||||
CURRENT | I | YES |
|
|
| |||||||||
VOLTAGE | V | YES |
|
|
| |||||||||
POWER FACTOR | FP | YES |
|
|
| |||||||||
POWERS | ACTIVE, REACTIVE AND APPARENT | YES |
|
|
| |||||||||
KEYPAD OPTION |
|
|
|
| ||||||||||
OPEN |
| YES |
|
|
| |||||||||
CLOSE |
| YES |
|
|
| |||||||||
TRIGGER | TRIPOLAR | YES |
|
|
| |||||||||
EVENT LOG |
|
|
|
| ||||||||||
OSCILOGRAFIAS | Pre fails - post failure | YES |
|
|
| |||||||||
DATE |
| YES |
|
|
| |||||||||
TIME |
| YES |
|
|
| |||||||||
FAULT CURRENT SEQUENCE +, - AND 0 |
| YES |
|
|
| |||||||||
FAULT SIGNALLING | USE OF LED | YES |
|
|
| |||||||||
INPUTS AND DIGITAL OUTPUTS |
|
|
|
| ||||||||||
DIGITAL INPUTS | 16 MIN | 16 |
|
|
| |||||||||
DIGITAL OUTPUTS | 6 MINIMUM | 10 |
|
|
| |||||||||
CURRENT NOMINAL SECONDARY | 1-5 AMP | YES |
|
|
| |||||||||
ADJUST TAP | LESSER or equal 0.5 In | YES |
|
|
| |||||||||
STANDARDS | ANSI-IEC | YES |
|
|
| |||||||||
POWER SUPPLY 1 | 80-240 VDC | YES |
|
|
| |||||||||
POWER 2 | 80-240 Vac | NON |
|
|
| |||||||||
SUPPLY TECHNOLOGY | DIGITAL MICROPROCESSOR | YES |
|
|
| |||||||||
PULSES OF VOLTAGE | DIGITAL INPUT, DIGITAL OUTPUT | YES |
|
|
| |||||||||
BLUETOOTH | APPLY FOR PLACED RECLOSERS | YES |
|
|
| |||||||||
WARRANTY |
|
|
|
| ||||||||||
10 years | MINIMUM | YES |
|
|
| |||||||||
TERMINAL TEST - SHORTCIRCUITABLE | YES |
|
|
| ||||||||||
TERMINAL TEST - SHORTCIRCUITABLE | SHORTCIRCUITABLE TERMINALS AND TESTS SHOULD COME WITH THE INSTALLATION MANUAL IN SPANISH, THE TERMINAL BOARD MUST BE ABLE TO WITHSTAND VALUE OF INJECTION OF SECONDARY CURRENT MINIMUM 100 A. IS ACCEPTED THAT THE TWO TERMINALS COME IN A SINGLE ELEMENT, IN CASE THAT THE PURCHASE INCLUDE BOARD POSITION, TERMINALS MUST BE ALREADY INSTALLED AND READY TO OPERATE. THE PROTECTIONS OF CNEL EP GROUP WILL CARRY OUT INJECTION TESTING ALTOGETHER WITH A TECHNICIAN OF MANUFACTURES OR SERVICEMAN OF THE OFFEROR AND VERIFY THE OPERATION THEREOF IN CONJUNCTION WITH THE PROTECTION RELAY. | YES |
|
|
| |||||||||
CERTIFICATES |
|
|
|
| ||||||||||
CERTIFICATE OF SOLE AUTHORIZED REPRESENTATIVE OF THE | OK | YES |
|
|
| |||||||||
CERTIFICATE KEMA IEC 61850-6, 7-1, 7-2, 7-3, 7-4 and 8-1 | OK | YES |
|
|
| |||||||||
CERTIFICATES STANDARD ISO 9001 | OK | YES |
|
|
| |||||||||
CERTIFIED TRAINING | YES |
|
|
| ||||||||||
TRAINING CERTIFIED IN SPANISH LANGUAGE WITH CERTIFIED INSTRUCTOR FROM FACTORY | 1 training 5 days, after that the OFFEROR is required to give training for a year until they are solvent doubts IED´s. this under prior coordination with the administrator of the contract of CNEL EP, these skills will be two-day minimum 5 times A year, to failure to comply with this shall present his bad CUMPLIEMIENTO for future contracts offered by CNEL EP. | YES |
|
|
| |||||||||
2 SUBJECT PROTECTIONS SETTINGS, THE PERSON WHO WILL GIVE THE TRAINING MUST BE PROTECTIONS ENG. AND SHOULD BE IN FULL KNOWLEDGE OF THE SUBJECT, ABLE TO RESOLVE ALL QUESTIONS SUBMITTED AT THAT TIME. | YES |
|
|
| ||||||||||
3. COMMUNICATION TO THE CONTRACT ADMINISTRATOR | YES |
|
|
| ||||||||||
4. IEC 61850, WANT TO MAKE AN EXAMPLE | YES |
|
| |||||||||||
5. EVIDENCE OF CURRENT INJECTION | YES |
|
| |||||||||||
6. INSTALLATION ON THE SAME FIELD, IF IT | YES |
|
| |||||||||||
LICENSE | FREE (N NUMBER OF USERS) | YES |
|
| ||||||||||
LOCAL TECHNICAL SUPPORT | ADDRESSES, PHONES, RESPONSIBLE | YES |
|
| ||||||||||
MANUAL | Spanish | English |
|
| ||||||||||
AMBIENT TEMPERATURE | MORE THAN 40 DEGREES, LESS THAN 10 | YES |
|
| ||||||||||
COMMUNICATIONS |
|
|
| |||||||||||
PORTS | TYPE |
| DESCRIPTION |
|
|
| ||||||||
FRONT | RJ-45, RS 485 |
| FIELD CONFIGURATION | RS232 |
|
| ||||||||
2 PORTS, REAR | ETHERNET |
| NETWORK CONFIGURATION WITH REDUNDANCY DOUBLE OR RING, SCADA INTEGRATION CONFIGURATION | YES |
|
| ||||||||
2 PORTS, REAR | FIBER OPTICS |
| NETWORK CONFIGURATION WITH REDUNDANCY DOUBLE OR RING, SCADA INTEGRATION CONFIGURATION | YES |
|
| ||||||||
1 PORT | DB9-IRIG-B |
| TIME SYNCHRONIZATION | YES |
|
| ||||||||
3 PORT | RS-485 |
| THE SCADA INTEGRATION | YES |
|
| ||||||||
CALIBRATION AND TESTING | OK |
| THE CONTRACTOR MUST GIVE IT | YES |
|
| ||||||||
SETTINGS | OK |
| CNEL EP ESM | YES |
|
| ||||||||
PROTOCOLS | ETHERNET | YES |
|
|
| |||||||||
MODBUS/TCP, DNP3/LAN/WAN, FTP, TELNET, PING, IEC 61850 | YES |
|
|
| ||||||||||
SERIAL | YES |
|
|
| ||||||||||
DNP3, MODBUS RTU, | YES |
|
|
| ||||||||||
|
|
|
|
|
|
|
|
|
|