Epoxy Floor Coating Putty Layer

China Epoxy Floor Coating Putty Layer, Find details about China Flooring, Coating from Epoxy Floor Coating Putty Layer

Model NO.
CM 101 ZT
Level
MID-Coat
Drying Method
Air Drying
Certification
ISO14001, CCC, RoHS, ISO9001
Substrate
Cement Base
Components
Waterborne
Formation Mechanism
Crosslinking
Application
Construction
Trademark
Ruisan
Specification
20 Kg/Bucket
Origin
Shandong, China
HS Code
3506912000
Model NO.
CM 101 ZT
Level
MID-Coat
Drying Method
Air Drying
Certification
ISO14001, CCC, RoHS, ISO9001
Substrate
Cement Base
Components
Waterborne
Formation Mechanism
Crosslinking
Application
Construction
Trademark
Ruisan
Specification
20 Kg/Bucket
Origin
Shandong, China
HS Code
3506912000
High-Quality Waterborne Epoxy Mid-coat
Product Description:
CM-101 ZT Waterborne epoxy is a two-component curing coating at room temperature. Component A is a waterborne epoxy curing agent, and component B is epoxy resin.

Product Sample:
Epoxy Floor Coating Putty LayerEpoxy Floor Coating Putty Layer
 Product Functions:
  • Improve the overall strength, increase the wear resistance, fill the ground defects.
Application Areas:
  • Floor painting in the workshop
  • Factories
  • Supermarket
Advantages of the Product:
  • Greater durability and performance.
  • More tolerant of petroleum contaminates in a concrete surface, making it ideal for garages and parking structures.
  • Glossier finish.
Technical Parameters:
State in containerNo hard lumps after mixing.
Density, g/ml1.05
Surface Drying Time,60 min
Complete Drying Time,7.5 hrs
Adhesion,Level 0
Proportion (Weight)Component A: Component B=3:1

Construction Reference:
  • Roller Coating is Recommended.
  • Before construction, component A and component B should be mixed according to 15:5 (weight ratio). After fully mixing, the construction should be carried out.
  • The construction shall be carried out in the surface temperature above 10ºC
  • With the use of a coating, the mixed coating should be used up within 30 minutes.
  • The second coating should be carried out after the lower layer is completely dried. The recommended interval is 12 hrs.
Epoxy Floor Coating Putty Layer
Epoxy Floor Coating Putty Layer
  
Product Delivery:
Epoxy Floor Coating Putty Layer


About us:
Shandong Ruisan Chemical Technology Co., Ltd. is located in Linyi City, Shandong Province. It is a modern technology company integrating R&D, production, sales, and trade. The company is mainly engaged in the research and development and promotion of new environmentally friendly water-based materials, such as waterborne epoxy series, waterborne epoxy resin, waterborne epoxy curing agent, waterborne epoxy floor paint and so on. The company's products are widely used in construction, decoration, home improvement, home appliances, automobiles, ships, transportation, light industry, electricity, and other industries. With a professional research team and standardized production technology, the company has in-depth research in the field of industrial anti-corrosion and developed a high-performance water-based epoxy series product with excellent anti-corrosion performance. The salt spray test is up to 2000 hours, leading the industry. The product is suitable for many fields such as ships and wind power. The company takes technological innovation and scientific and technological talents as the core elements, paying attention to product quality and customer service quality. Products cover floor paint, anti-corrosion industrial paint, asphalt, ink, filling tile gap, and other application materials. And the company has passed CE, SGS, REACH, RoHS, ISO 9001 Quality Management System certification, ISO 14001 Environmental Management System certification, OHSAS 18001 Occupational Health and Safety Assessment Series certification. And the company has obtained a number of patents related to environmentally friendly functional new materials.

Epoxy Floor Coating Putty Layer



Epoxy Floor Coating Putty LayerEpoxy Floor Coating Putty Layer

Epoxy Floor Coating Putty Layer       Epoxy Floor Coating Putty Layer

Epoxy Floor Coating Putty Layer
Epoxy Floor Coating Putty Layer



Certificates:

FAQ
Q: Can I be your agent?
A: Sure, we are looking for agents all over the world.

Q: Are you the manufacturer?
A: Yes.

Q: Can I get a sample before place an order?
A: Yes, free sample.

Q: How about the quality grantee period?
A: One year.

Q: What is the min. Order quantity?
A: 200kg.

Q: What is the delivery time?
A: Within 10 days since received the deposit.