Coal Fired Steam Boiler Manufacture in China

Coal Fired Steam Boiler Manufacture in China, Find details about China Biomass Steam Boiler, Steam Boiler from Coal Fired Steam Boiler Manufacture in China

Model NO.
DZL
Drum Placement
Horizontal Boiler
Pressure
Low Pressure
Manufacturing Level
A
Burning Style
Cyclone Furnace
Usage
Industrial
Heating Efficiency
>78%
Product Name
Biomass Rice Husk Steam Boiler
Keywords
Biomass Boiler, Rice Husk Steam Boiler
Rated Working Pressure
0.7, 1.0, 1.25, 1.6, 2.5 MPa
Design Fuel
Biomass, Rice Husk
Capacity
8-20 Ton
Material
Q345r Steel Plate
Steam Temperature
170, 184, 194, 206, 224 Centigrade
Warranty
1year
Weigth
Dependent
Trademark
xingfu boiler
Transport Package
(20-Feet or 40-Feet
Specification
dependent
Origin
Qingdao, China
Model NO.
DZL
Drum Placement
Horizontal Boiler
Pressure
Low Pressure
Manufacturing Level
A
Burning Style
Cyclone Furnace
Usage
Industrial
Heating Efficiency
>78%
Product Name
Biomass Rice Husk Steam Boiler
Keywords
Biomass Boiler, Rice Husk Steam Boiler
Rated Working Pressure
0.7, 1.0, 1.25, 1.6, 2.5 MPa
Design Fuel
Biomass, Rice Husk
Capacity
8-20 Ton
Material
Q345r Steel Plate
Steam Temperature
170, 184, 194, 206, 224 Centigrade
Warranty
1year
Weigth
Dependent
Trademark
xingfu boiler
Transport Package
(20-Feet or 40-Feet
Specification
dependent
Origin
Qingdao, China
Model/Parameter/ItemDZL
2-0.7-AII
DZL
2-1.25-AII
DZL
4-1.25-AII
DZL
4-1.6-AII
DZL
6-1.25-AII
Rated capacityt/h22446
Operation pressureMpa0.71.251.251.61.25
Steam temperatureC169.6194194203194
Water-inlet temperatureC2020206020
Heating efficiency%77.477.4818177.4
Area of stokerm23.043.25.45.47.48
Steam valve diametermmPN1.6
DN80
PN1.6
DN80
PN1.6
DN100
PN2.5
DN100
PN1.6
DN125
Water inflow valve
diameter
mmPN1.6
DN40
PN1.6
DN40
PN1.6
DN50
PN2.5
DN50
PN1.6
DN50
FuelCoal available II type bitumite,lcv:17700-21000KJ/kg
Consumptionkg/h290290580580960
Dimension of biggest parts for shipment
(LxWxH)
m5.82*2.1*3.225.82*2.1*3.226.5*2.66*3.526.5*2.66*3.527.1*3*3.65
Weight of biggest
parts for shipment
t1819272932
Overall dimension of
Assembled boiler
(LxWxH)
m6.5*4.0*3.76.5*4.0*3.77.2*4.5*4.07.2*4.5*4.07.9*4.5*4.1
Water supplyModel 11/2GC-5*41 1/2GC-5*411/2GC-5*71 1/2GC-5*72GC-5*6
Motor powerkw37.57.51115
Blast
fan
Model G6-41-13No
5.4A
G6-41-13No
5.4A
G6-41-13No
6.4A
G6-41-13No
6.4A
G6-41-13No
7.1A
Flowm3/h4358-23104358-23107358-35967358-359610354-5349
PressurePa994-1254994-12541436-11811436-11812270-1697
Motor powerkw335.55.57.5
ID fanModel Y6-41-13No
5.4C
Y6-41-13No
5.4C
Y6-41-13No
7.1C
Y6-41-13No
7.1C
Y6-41-13No
10C
Flowm3/h8901-43508901-435015219-817115219-817132144-16607
PressurePa2568-32402568-32402454-32832454-32832574-3444
Motor powerkw1111222237
 
Model/Parameter/ItemDZL1.4-
0.7-95/70-AII
DZL2.8-
0.7-95/70-AII
DZL4.2-
1.0-115/70-AII
Rated capacityMW1.42.84.2
Operation pressureMpa0.70.71
Hot water temp.C9595115
Water-inlet temperatureC707070
Heating efficiency%767678
Area of stokerm23.045.147.4
Heating aream2120002400036000
Water inlet & outlet
Diameter
mmPN1.6
DN100
PN1.6
DN125
PN1.6
DN150
FuelCoal available II type bitumite,lcv:17700-21000KJ/kg
Consumptionkg/h290580960
Dimension of biggest parts for shipment
(LxWxH)
m5.82*2.26*3.226.51*2.6*3.527.5*2.9*3.5
Weight of biggest
parts for shipment
t19.126.531
Overall dimension of
Assembled boiler
(LxWxH)
m6.5*2.55*4.537.5*4.0*57.9*4.5*4.4
Water
pump
Model IS80-65-160IS100-80-160IS125-100-200B
Flowm3/h50100172
Liftm323837
Motor powerkw7.51530
Blast
fan
Model G6-41-13No
5.4A
G6-41-13No
6.4A
G6-41-13No
7.1A
Flowm3/h4358-23107358-359610354-5349
PressurePa994-12541436-11812270-1697
Motor powerkw35.57.5
ID fanModel Y6-41-13No
5.4C
Y6-41-13No
7.1C
Y6-41-13No
10C
Flowm3/h8901-435015219-817132144-16607
PressurePa2568-32402454-32832574-3444
Motor powerkw112237
Biomass fired steam boiler description
1.The boiler shall adopt double drum,monolayer arrangement,compact structure,as well as large heating surfaces which are more 10% than those of same kinds of products,featuring the following advantages such as sufficient output,safe and reliable operation,short construction period,low installation cost ect.
2.The design of cyclone reburning chamber in furnace resulted in the decrease of dust contained in the flue gas.At the same time,incandescent carbon black particles shall burn further,enhancing the boiler thermal efficiency,decreasing gas blackness,as a result,the gas emission concentration shall meet the requirements of grade A environmental protection area.
3.The grate shall employ the technology patent of small roller structure,boundary grate and so on,improving the operation reliability of the boiler.
4.Since the adoption of technology patent for the sealed wind chamber and bilateral grate air register,and the application of machining cone seal structure to grate adjusting air eauipment,the sensitivity of the grate shall be improved.
Our Partner
Recent years, our product have been successfully exported to Europe, Africa,Latin America,South East Asia and middle east countries and areas.
Company information
Qingdao Xingfu Boiler Thermopower Devices Co., Ltd, established in 1981, is the parent company of Qingdao Honest Trading Co., ltd .It is specialized in manufacturing pyrolysis plant, pressure vessels and thermal power equipment, authorized by the General Administration of Quality Supervision,Inspection and Quarantine of the People's Republic of China.
The company has more than 15 years experience in manufacturing pyrolisis plant,pressure vessels and boiler auxiliaries.It has its own technology team,and developed and invented lots of new products and new technology applying to reality.The company invents semi continuous waste tyre pyrolysis plant ,batch type waste tyre pyrolysis plant, full continuous plastic pyrolysis plant,oil distillation equipment and other pressure vessels.Recent years, our products have been successfully exported to Europe, Africa,Latin America,South East Asia and middle east countries and areas

Packaging & Shipping
Packaging details1*40FR and 1*40HQ for 10 tons
2*40 HQ for 5 tons
Weight: about 30tons
All goods are packed with export standard package to make sure 
no damage during transportation.
Detail detailsabout 30 days after receiving deposit.