Iaaf Approved Rubber Running Track Sport Flooring Sport Surface

China Iaaf Approved Rubber Running Track Sport Flooring Sport Surface, Find details and Price about China Running Track, Prefabricated System Running Track from Iaaf Approved Rubber Running Track Sport Flooring Sport Surface

Model NO.
Prefabricated System Running Track
Installation Ways
Machine
Vertical Deformation
2.3mm
Usage
Outdoor, Indoor
Environmental Protection Level
E1
Durable Years
8-10 Years
Feature
Environmental Friendly
Material
Polyurethane
Function
Anti-Static
Raw Material
Edpm, PU Binder
Application
School, Stadium, Playground, Jogging
Sample
Free
Trademark
Flyon
Transport Package
PU Material 200kg/Drum, EPDM/SBR Granules:25kg/Bag
Specification
200kg/drum; 25kg/bag
Origin
China
Model NO.
Prefabricated System Running Track
Installation Ways
Machine
Vertical Deformation
2.3mm
Usage
Outdoor, Indoor
Environmental Protection Level
E1
Durable Years
8-10 Years
Feature
Environmental Friendly
Material
Polyurethane
Function
Anti-Static
Raw Material
Edpm, PU Binder
Application
School, Stadium, Playground, Jogging
Sample
Free
Trademark
Flyon
Transport Package
PU Material 200kg/Drum, EPDM/SBR Granules:25kg/Bag
Specification
200kg/drum; 25kg/bag
Origin
China


Iaaf Approved Rubber Running Track Sport Flooring Sport Surface
Iaaf Approved Rubber Running Track Sport Flooring Sport Surface
Iaaf Approved Rubber Running Track Sport Flooring Sport Surface
 

Project  Pictures


Iaaf Approved Rubber Running Track Sport Flooring Sport Surface
Iaaf Approved Rubber Running Track Sport Flooring Sport Surface
 

Running Track Athletic Track 

 

The base layer consists of Black Styrene Butadiene Rubber(SBR) granules,bound together  with a specially formulated,  100% s olids  MDI  based  single  component polyurethane,at a thickness of 10mm(3/8inch).the top layer consists of a specially formulated, colored polyurethane into Ethylene Propylene Dience Monomer(EPDM) which  granules have been embedded before curing for a thickness of 3mm(1/8inch).

NameSandwich System Running Track    
Base RequirementCement Concrete or Bituminous Concrete 
Thickness9-13mm
Suitable ScopeEDPM,SBR,PU Binder

 Packaging & Shipping

MOQ500 Square Meter
Supply Ability1000Tons/Per Month
Delivery Times15days
Payment TermsT/T
PortGuangzhou 
FAQ
Q:What is the Production time?

 A:15-25days.

Q:What are the options for the base construction of a running track?

A:Based on asphalt or concrete.
 
Q:What is the life Span for Running track?

A:10-15years.

Q:How many system of Synthetic track surface,what is the best choice?

A: 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.

 
Spray coating:Price competitive , permeable and surface paint by machine, more suitable for school or practice project
Sandwich sytem: EPDM broad be handwork,is professional than spray coat,most pouplar in the world market.
Full pour System: Best quality, bottom layer is PU with less sbr granules mix. Suitable for professional games and international school.
Prefabricate :Eco-friendly,package by roll, easy for installation,Professional for stadium international games,like Olympic games.