China Dust Suppression Sand Control Long Term Liquid Acrylic Polymer, Find details about China Soil Stabilizer, Dust Suppression from Dust Suppression Sand Control Long Term Liquid Acrylic Polymer
Water-based liquid styrene acrylic polymer emulsion
HN-541 Water-based styrene acrylic polymer emulsion for light road construction | Appearance | Milky white and light blue liquid |
Solid content | 50+-1% | |
Viscosity.cps (25oC) | 1000-3000 | |
PH | 6.0-7.0 | |
Glass Transition Temperature (Tg) | 25oC |
HN-130va Water-base PVA polyvinyl acetate acrylates copolymer emulsion for dust suppression, erosion control | Appearance | Milky white liquid |
Solid content | 48+-1% | |
Viscosity.cps (25oC) | 100-1000 | |
PH | 2.0-5.0 | |
Minimum Film Formation Temperature (MFT) | 0oC | |
Ca2+ stability 5%CaCl2:emulsion=1:3, 48h, No Flocculation, No Stratification. | Pass |
HN-158t Water-based silicone modified styrene acrylic emulsion for dust/sand suppression, erosion control | Appearance | Light blue |
Solid content | 50+-1% | |
Viscosity.cps (25oC) | 1500-3000 | |
Particle size (nm) | 90-160 | |
PH | 6.0-7.0 | |
Minimum Film Formation Temperature (MFT) | 0oC | |
Ca2+ stability 5%CaCl2:emulsion=1:3, 48h, No Flocculation, No Stratification. | Pass |
HN-158t Water-based silicone modified styrene acrylic emulsion for dust/sand suppression, erosion control | Appearance | Light blue |
Solid content | 50+-1% | |
Viscosity.cps (25oC) | 1500-3000 | |
Particle size (nm) | 90-160 | |
PH | 6.0-7.0 | |
Minimum Film Formation Temperature (MFT) | 0oC | |
Ca2+ stability 5%CaCl2:emulsion=1:3, 48h, No Flocculation, No Stratification. | Pass |
A unique emulsion of microscopic cross-linked polymers creates the basis of ability to outperform and provide immediate results.
Perfect for 'non-trafficked' areas, the ultra-low concentration makes it the ideal performance product for mining, civil & infrastructure industries. It has been developed with ease in mind and is highly effective, environmentally friendly and increasingly cost-effective over time.
It can be applied onto all forms of tailings and minerals, ash dams, stockpiles and substrates. The polymers penetrate into the substrate below, forming an interconnected flexible crust, binding to the fine particles and granules to eliminate dust. Using robust polymer-based products, forms a stable layer of bonded material, resistant to erosive wind and rain forces.
Suitable for all forms of exposed stockpiles, substrates, tailings and minerals
Forms a strong, durable and flexible crust
Eliminates dust lift-off after a single application
Withstands moderate to heavy rain events
Non-toxic and environmentally friendly
Water Retention Basin & Pond Lining
Aircraft Runways (Heavy use)
Aircraft Runways (single engine)
Helicopter landing pads( Heavy craft)
Helicopter landing pads( Light craft)
Heavy Haul Roads & Mining Roads
Military Convoy & Supply Roads
Roads ( High Traffic)
Residential Driveways
Parking lots
Roads (Light Traffic)
Golf Course Bunker Liner
Golf Course Cart Paths
Walking Trails and Paths
Road Sealer over Soiltac Stabilized Base
BMX Tracks
Temporary Parking Lots
Temporary Roads & Detours
Road Shoulders
Slope Erosion Control (Steep Slope)
Slope Erosion control (Average slope)
Slope Erosion Control (Light Slope)
Stock Pile Dust Capping (Steep Slope)
Stock Pile Dust Capping (Average Slope)
Stock Pile Dust Capping (Light Slope)
Hazardous Material Capping & Sealing
Landfill Capping & Reclamation
Odor & Vapor Suppression
Mine Tailings Capping & Reclamation
Coal Rail Car Capping
Dust Control (30 Days)
Dust Control (90 Days)
Dust Control (6 Months)
Dust Control (12 Months)
Dust Control (12-24 Months)
Hydroseed & Hydromulch Tackifier
Base Stabilization Light (4-10cm deep)
Base Stabilization Average(4-10cm deep)
Base Stabilization Heavy (4-10cm deep)
Road Pot Hole Repair (4-10cm deep)
Adobe Blocks & Earth Blocks (6-15cm Tall)
Base Stabilization Light (6-15cm deep)
Base Stabilization Average (6-15cm deep)
Packing:
50kgs plastic drum/160kgs plastic drum/200kgs plastic drum/1000kgs IBC pallet/20000kgs soft packing.
Storage and transportation:
1.This chemical should be stored in a ventilated and dry room, avoiding direct sunlight.
2.Transport and store in the 5oC-35oC environment.
3.Shelf life is 1 year from the date of first use.
Safety notice:
The water-based polymer emulsion is non-toxic and non-flammable. If it splashes into the eyes, it should be washed with plenty of water immediately.
Q: How long is your lead time?
A: The normal lead time is 5-10 days. It is according to the quantity and inquires of us before place any orders.
Q: Do you provide free samples? Are the samples free of charge or need to be paid?
A: Yes, Free samples of 0.5-1 kg for each type are available for our customers. The samples are free but the freight is collected.
Q: What are the terms of payment?
A: Full payment is needed in advance before shipment.
Q: How about your research ability? Do you offer technical support services?
A: We have our own research labs and testing labs. Many universities and institutes have built a long-term strategic partnership with us. We offer technical support services for our customers.
Q: Can I place a small order for the first time to test the quality?
A: Yes, you can order 1-5 tons of emulsion polymers to run tests in your factory for the start order.
Q: Can I visit your factory?
A: Yes, you are welcome to visit our production factory in Qingdao or headquarters in Qingzhou.
Q: Do you accept customized orders?
A: Yes, we take customized orders. Please inquire of us before place such orders.
Q: Can you help us develop our own factory in our own country?
A: Yes, we can help our customers to build their own factories in their countries. Please talk with our director about the details.