H20 Timber Beam Plywood Formwork

China H20 Timber Beam Plywood Formwork, Find details about China Formwork, Building Material from H20 Timber Beam Plywood Formwork

Model NO.
18000000
Trademark
ForPro
Specification
customized
Origin
Shanghai
HS Code
7308400000
Model NO.
18000000
Trademark
ForPro
Specification
customized
Origin
Shanghai
HS Code
7308400000
Product Description

H20 Timber beam is an important part of formwork system, and has a very wide range of application in engineering. It is mainly used in the erection of horizontal formword system, vertical formwork system, column formwork system and other ferroconcrete panel system.

According to the need, standard holes can be drilled in the two ends of timber beam. We can lengthen the timber beam by end-to-end join. According to customers' demand, we can produce timer beams with any length
 
Specification

1) Wood material: Birch

2)Flange size:80*40mm

3)Web width: 24/27 mm(multi-layer)

4)Weight: 5.50kg/metr

5)Legth available:1.00/1.50/2.00/2.50/3.00/3.50/4.00/4.50/5.00/5.50/6.00/12.00meter

6)Quality assure: ISO9001

7)Surface finishing:waterproof yellow painting 

8)Packing:different length loaded differently


H20 Timber Beam Plywood Formwork

Company Profile

ForPro Formwork Technology Co.,Ltd is a professional formwork company concentrating on formwork R&D, design manufacture and selling.

Our products are large size panel system, crane lift climbing formwork system, hydraulic climbing formwork system, dam formwork, single side supporting formwork, reinforcement installation platform, heavy duty load bearing tower, safety protection facilities and spare parts of various formwork systems.

With more than 15 years' rich experiences in formwork industry ForPro technical team has won high reputation from our customers. Relying on profound technical accumulation and strong R&D capability, ForPro provides projects with economic and efficient formwork solution package. We can develop custom-made formwork system according to client's special requirements and we can also support our customers to renovate and upgrade their existing formwork facilities.

We successively provided formwork system and technical services to Karachi Nuclear Power Plant, Hongyanhe Nuclear Power Plant, Zhejiang Daishan Island project, Ningbo Metro Line 3 and Hefei Metro Line 4 project.  Sutong GIL gallery project, Jinsha river bridge, Xinpu chemical tank, Guanghui LNG tank, Chaozhou Huafeng LNG tank, Tangshan LNG, Yangshan LNG,Yanglin LNG tank, Xiapu Nuclear power plant and Fangchenggang Diesal plant project etc.
H20 Timber Beam Plywood Formwork

Package 

H20 Timber Beam Plywood Formwork

Our Service


     1. Analysis of the initial stage, and provide professional advice, consultation and formwork planning.

      2. Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.

      3. Choose a best propasal to help our clients to bid for the project.

      4. Start to devise the formwork detailedly according to the winning bidding.

      5. Provide the layout and assembly of the formwork, gives on-site advice and continuous support service.

Contact Information
H20 Timber Beam Plywood Formwork