China XCMG Official Xct20L4 20ton Mobile Truck Crane Price for Sale, Find details about China Construction Machinery, Mobile Crane from XCMG Official Xct20L4 20ton Mobile Truck Crane Price for Sale
XCMG official XCT20L4 20ton mobile truck crane price for sale
XCT20 Truck Crane is an efficient, economic and applicable brand new product designed on basisof XCMG G-generation R&D platform. With 3-axle self-made special chassis, 4-section boom, built-in double independent winch and power system with low speed and large torque, this crane has industry-leading lifting height, lifting capacity and working efficiency. Integrated with new energy-saving hydraulic system, mature engine system of Shanghai Diesel Engine and WeichaiEngine, all covering walking surface and XCMG man-machine interactive system with the level of car provides more options for customers and bring more comfortable driving and operation experience. XCT20 Truck Crane is widely suitable for construction site, urban renewal, traffic transportation, port,bridge, oil field, mine field and othercomplex working environment. It has industry-leading performance.
(1) 360° full slewing operation and powerful lifting performance
Optimized matching of whole crane according to multi-body dynamics is adopted, reasonable arrangement and optimum appliedforce. With 4-section 'U'crosssection of boom adopted, boom length is 34m, jib length is 8.3m, leading in the high level of industry;With 5 jack equipped, 360° full slewing operation is realized.
(2) New energy-saving hydaulic system contributes to smooth manipulation, perfect fine control and high working efficiency
Exclusive matching throttle with compensation afterwards and load-sensitive technology results in the higher stability of the lowest system flow, more reasonable system rigidity, more outstanding fine control and smoothness. With double-pump confluence of hoisting, elevating and telescoping, the working speedof main and auxiliary winch can reach135m/min, which improves the working efficiency greatly. The distribution of flow in actuators is more optimized when conducting compound movements and the working efficiency is more outstanding.
(3) Integrated PLC control system contributes to higher reliability of products and more convenient maintenance
Since the electric system is updated to PLC control system with new class cable harness ofhigh protection, the circuit branches become less owing to the cable harness branch design of various passages. Fault elimination in the bottom layer improves the reliability. The combination design of controller, display and GPS integration with waterproof connector clips enhances the system reliability. With self-diagnosis functions of errorsin control system,the fault elimination becomes more convenient as well as the maintenance.
(4) New dynamic platform, strong power and energy-saving
Taking engine with low speed and large torque as core,matching transmission with high speed ratio, giving consideration to low speed climbing performance and high speed site transferring performance, perfect fusion of high drivingforce and low fuel consumption is realized,leading in the high level of industry;.
With domestic engines made by Shanghai Diesel engine and Weichai engine equipped, rated output power is 192Kw and 199kw respectively, which provides various options for customers.
(5) New suspension system with higher comfort
The comfortis improved by 15%~20% with less disc taper-leaf spring in front suspension and rubber suspension with V-shaped thrust rod in rear suspension of 3-axle.
Category | Item | Parameter | Unit | |
Main performance | Max. total rated lifting capacity | 20 | t | |
Min. rated working radius | 3 | m | ||
Turning radius at turntable tail (counterweight) | 3425 | mm | ||
Max. load moment | Base boom | 900 | t.m | |
Fully-extended boom | 585 | t.m | ||
Longitudinal | 5.23 | m | ||
Outrigger span | Lateral | 6.16 | m | |
Base boom | 10.3 | m | ||
Fully-extended boom | 39.5 | m | ||
Hoist height | Fully-extended boom + Jib | 47.6 | m | |
Base boom | 10.3 | m | ||
Fully-extended boom | 40 | m | ||
Working speed | Boom length | Fully-extended boom + Jib | 48.3 | m |
Jib offset angle | 0,15,30 | |||
Boom elevating time | Boom raising | ≤35 | s | |
Boom telescoping time | Boom fully-extended | ≤90 | s | |
Max. slewing speed | ≥3 | r/min | ||
Main winch system | No load | ≥135 | m/min | |
Luffing jib winch | No load | ≥135 | m/min |