1mm Thickness 100% Virgin PTFE Sheet

China 1mm Thickness 100% Virgin PTFE Sheet, Find details about China Teflon Sheet, PTFE Tube from 1mm Thickness 100% Virgin PTFE Sheet

Width(mm)
as Your Requirement
Thickness(mm)
1.5-3.0
Trademark
CHUNHUAN
Transport Package
Wooden Boxes
Specification
1200 1500 1800 2000 2700
Origin
China
HS Code
39209910
Width(mm)
as Your Requirement
Thickness(mm)
1.5-3.0
Trademark
CHUNHUAN
Transport Package
Wooden Boxes
Specification
1200 1500 1800 2000 2700
Origin
China
HS Code
39209910
PTFE CARBON SHEET
1. Material: virgin PTFE+graphite ,no recycle.
2. Certificate: ISO9001,MSDS,RoHs,REACH,FDA,Certificate of Origin.
3. Size could be made on the basis of customer's requirement.
4. Payment item: T/T,L/C,DP or others.
5. Price item: FOB,CIF,CFR and so on.
6. Delivery time: As your request,usually within 7 days.
7. Free samples can be offered as your requirements.

PRODUCT FEATURES:
1.Low temperature and high temperature resistance (-190 ºC- +250 ºC)  
2.corrosion resistance , weather resistance  
3.high lubricity, no adhesion 
4.non-toxic, 
5.non-flammable  
6.acid and alkali resistance (except molten alkali metals) 
7.antioxidant.


APPLICATIION:
1.Low temperature and high temperature resistance (-190 ºC- +250 ºC)  
2.corrosion resistance , weather resistance  
3.high lubricity, no adhesion
4.non-toxic, 
5.non-flammable  
6.acid and alkali resistance (except molten alkali metals) 
7.antioxidant.


SPECIFICATION:
CategoriesLength(mm)Width(mm)Thickness(mm)
Skived sheetAs your requirementAs your requirement1.5-3.0
Note: we could make irregular or not included sizes according to requirement of customers.

1mm Thickness 100% Virgin PTFE Sheet
Our Service
1. Your inquiry will be replied within 2 hours during working time, within 24hours when rest time.
2. Our working time is 7:30am-17:30pm, Monday to Saturday.
3. General samples time can be arranged within 2-5days.
4. Orders will be produced exactly as request and approved samples.
5. When mass production, we send photos to show the production line and confirm the estimate time again.
6. At the end of mass production, photos and samples will send to you for approval. You can arrange the inspection.
7. Before shipment, our QC will have inspection to make sure the quality
8. We always try best to ensure every order to delivery in time.

Payment Terms
1. T/T, Cash, L/C
2. 30% deposit, 70% balance before shipment.
3. Lead time: 15 days after received deposi for 2 tons.
4. Delivery way: By sea, By air, By EMS, DHL,UPS,TNT, FedEX.

Packing&Delivery
For sample: By EMS, DHL,UPS, TNT,FedEx  Around 5-7 working days to arrive.

For Bulk order
1. Qty of 2 tons within 15 days
2. Via sea
3. Delivery time: we finish production in 15 days for 2 tons
4. For 20 GP, may need around 30 days
 
About our factory
Zhenjiang Chunhuan Sealing Materials Co.,Ltd (Group) Is The Member Of China Fluoroplastics Commissions.Our Company Has More Than 30 Years' Professional Production Experience,Familiar With Modern Equipment And Techniques. 
 
We specialize in PTFE which include sheet, bar, tube, tape, film, gasket,  braided packing and all special type components. We can meet your special demand.
1mm Thickness 100% Virgin PTFE Sheet