China Sy-B035 Lab Diabete Center Full-Auto Glycated Hba1c Analyzer Hemoglobin Machine, Find details about China Hemoglobin Machine, Glycated Hba1c Analyzer from Sy-B035 Lab Diabete Center Full-Auto Glycated Hba1c Analyzer Hemoglobin Machine
Easy Operation
High-definition color touch screen, touch-tone menu, operation freely
4.5 minutes per sample
1-15 samples, Cal 1, Cal 2, QC, ST
5-20ul whole blood, put into sample cup, press '' START''
Expand Capacity
Remote monitoring, online upgrade, Interface to LIS system
Independent TF card, user can copy the sample data to PC easily,
and print comprehensive report for each patient.
Simple Maintenance
Full Modular Design
Automatic washing channel
Easy to change the chromatography column
Specification of Glycated HbA1c Analyzer:
Testing Method: Low pressure ion exchange liquid chromatography |
Testing Item:Glycated hemoglobin HbA1c |
Testing Time : 3 minutes (reporting),Full-processing 4.5 minutes |
Testing Parameters: Precision (CV) ≤ 3%, Accuracy(V) ≤1.50% |
Testing Scope:3.0%-18.0% |
Sample Type :Whole blood, dilute blood |
Photometer :415nm LED Integral flow colorimeter |
Display :320x240 LC Graphic display, displaying real-time testing curve |
Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.