China Prefabricated Pre Engineered Metal Structural Steel Frame Structure Construction Prefab Warehouse Workshop Factory Storage Building Zy201892917, Find details about China Steel Construction, Steel Structure Warehouse from Prefabricated Pre Engineered Metal Structural Steel Frame Structure Construction Prefab Warehouse Workshop Factory Storage Building Zy201892917
Item Name | Prefabricated Pre Engineered Metal Structural Steel Frame Structure Construction Prefab Warehouse Workshop Factory Storage Building ZY201892917 |
Main Material | Q235/Q345 Welded H Beam and Hot Rolled Section steel structure |
Surface | Painted or Hot DIP Galvanized |
Roof & Wall Panel | EPS Sandwich panel /Single Corrugated Steel Sheet/ Colour sheet with Glass-wool, for customers choose |
Window | PVC Steel or Aluminum Alloy heavy equipment workshops prefab light steel structures |
Door | Sliding Door or Rolling Up Door |
Service | Design, Fabrication and Installation |
We can make quotation according to customer's drawing or requirement; (size by length/width/height and wind speed), offering a free design steel structure drawing and all detailed drawings for installation. | |
Design software: Auto CAD,PKPM,MTS,3D3S, Tarch, Tekla Structures (Xsteel)V12.0.etc | |
Packing | According to customer's requirement heavy equipment workshops |
Load into 40/20GP,40HQ or 40OT prefab light steel structures |
Packaging Details: | Normal packing or As per customer's detail requirement |
Delivery Detail: | 45~60 days after receiving deposit |
If you need, welcome to contact me .008617806251067 | |
Only provide us with the following information,you can get a quotation: | |
Design Parameters | 1)Local wind load(kg/m2),Snow load(kg/m2) |
2)Size:width X length X eave height,roof slope | |
3)which kind of Wall and Roof panel ? | |
4)Style of Doors and Windows | |
5)Crane(if you have):crane span,crane lift height, max lift capacity,max-min wheel pressure | |
6)Or your idea! |