China Automatic Drop Down Case Packer for Juice Beer Bottle, Find details about China Packing Machine, Water Bottle from Automatic Drop Down Case Packer for Juice Beer Bottle
Product Parameter:
Type | WKD-LZX-18F |
Power supply | 220/380V, 50/60HZ, 3KW |
Air pressure | 0.5-0.7MPA |
Machine size | L4000*W1200*H1750mm |
Carton size | L200-480*W150-380*H100-350mm |
Packing speed | 18 cases/min |
PLC | Siemens |
Touch screen | Siemens |
Optoelectronic switch | P+F |
Electrical magnetic valve | AIRTAC |
Pneumatic element | AIRTAC /SMC/ FESTO |
Hot Melt system | NORDSON |
Model details:
This machine is designed for flat bottles, considering the flat bottle of product features, on the separation line increased servo mechanism, controlled by the servo products into the whole conveyor line, make the products ordered, positioning accuracy, avoid the phenomenon of the bottle and plugging.
About us:
Originated in Shanghai in 2011 as "Shanghai V-packer Engineering Corporation" and moved to Kunshan (adjacent to Shanghai) in 2016 being renamed as Weikeda Packaging Technology (Kunshan) Co.,Ltd, we are only half an hour and two hours driving from Shanghai Hongqiao airport and Shanghai Pudong international airport respectively.
Nowadays, we have four equipment series, namely: wrap around case packer, automatic case packer (including case erector and case sealer), palletizer and conveying system, covering product in drinks, dairy, oil grease, seasoning and other industry. We have cooperated with Sinopec, COFCO, Total, 3M and many other famous companies from home and abroad.
Being a High-Tech enterprise engaging in end-of-line packaging solution with R&D, manufacturing, marketing and service integrated and with the mission "people oriented, technology driven, trustworthy running and to build a respectful brand", we are always devoting to meet diversified packaging requirements from and expecting to move forward with our valued customers.
After sale service:
1. Installation
After equipment reached the workshop of customer, We will arrange seasoned technician for equipment installation, debug and test production and at the same time make the equipment reach the rated producing capacity of the line. Time for installation and debug is around 15-25 days.
2. Training
Our company offers technology training to customer. The content of training covers structure and maintenance of equipment, control and operation of equipment. Training will be arranged in the workshop of customer. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.
3. Quality guarantee
We promise that our goods are all new. They're made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could last for one year without adding any aseptic.
Certifications:
FAQ:
1. Are you a factory or trading company?
We are a professional packaging machine manufacturing factory that set up for 10 years. We always pay attention to the development of the industry. We can give a discount according to the quantity of machine you purchase.
2. How long can I get feedback after inquiry?
We will reply you within 10 hours in working day.
3. Where is your factory located? How can I visit there?
Our factory is located in Qian Deng Town, Kun Shan City, Jiangsu Province, China.
We will provide pick-up service if you want to visit our company. You can choose the destination of Pudong airport or Hongqiao airport. Hongqiao airport will be much more closer to our company.
4. Delivery time
Machines & molds order takes 55 work days after pre-payment received.
5. What is the package? Is it suitable for shipment?
Machines will be packed by the standard wooden case or PE film wrapping.
It is suitable for shipment.
6. Payment term
30% by T/T as down payment, balance 70% by T/T or L/C before delivery.
7. Can I trust you?
Sure, we are the manufacturer certified by SGS and CE,
8. How long is the warranty for machines?
Machines warranty is 12 months from installation & commissioning.
9. How' s your after-sale service?
After sales support and service is very important to customers and we will respond to you soon if parts are required they would be sent to you by international courier within 48 hours.
10. Can you engineer come to our place to help with machine installation & commission?
Yes, our engineers are available to travel to your place. Round flight tickets & accommodation will be at your cost. And the cost for our labor is one hundred USD per person per day.