Shoring base plate for frame scaffolding(exterior):
1.Shoring base plate for frame scaffolding is designed to fix the shoring screw jack.
2.There are tubes of different diameters used to weld to plates,which is interior base plate or exterior base plate.
3.Cusotmized sizes can be produced as requested
4.Surface finish: electro galvanized,or powder coated
5.Packing:bags
6.High quality,competitive price and fast delivery
7.Other shoring components,such as heavy duty scaffolding frame,galvanized cross brace,J head,levelling jack are manufactured as well.
Type | Shoring Frame scaffolding base plate |
Material | Q235 material with high tensile and yield stress |
Color | silver,red,etc. |
Surface Treatment | Electro galvanized,powder coated,etc. |
Advantages | Top quality, Competitive price, Timely delivery, Good Service, Standard package, |
Minimum order | 1 piece |
Supply ability | 20 containers/month |
Port | Nanjing/Shanghai |
Currency | USD,RMB |
Payment | L/C, T/T, 30% in advance |
Package | Bags and Pallet |
Delivery | according to quantities to be need |
FAQ
1.---What is your product range?
---Ringlock system,frame system,tubes and couplers,cuplock system,props,other scaffolding accessories and metal products.
2.---What is MOQ?
---Usually we don't have a MOQ,but it depends on the product you are looking for
3.---Can I request samples?Is it free?
---Yes,we can offer free samples on most itmes if it is not too heavy or big
4.---Do you offer OEM service?
---Yes
5.---How you do the quality control?
---Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.
6.---Do you have certificate?
---Clients need to pay the cost to do the test from Third Party Testing Agent.Factory certificates can be offered for some products.We have testing machines in the factory,and also working with labs for testing.
7.---What is production time?
---Usually it takes 25-30 days for the first container,production goes faster after the first container once all raw materials are ready.The more the faster.Partial shipment can be arranged if requested.
8.---What is your payment term?
---T/T is prefered.L/C at sight can be accepted in some area.
9.---What is your after-sale service?
---All the after-sale problems will be solved based on mutual friendly communication.
In case of quantity shortage,the detailed certificates should be sent to our side in seven days after the goods arrive at your warehouse.In case of quality discrepancy,such as problems caused by raw material,welding,or surface finish,the detailed certificates should be sent to our side.If it is confirmed caused by our side for the above two mentioned situations,the loss will be compensated as the new goods sent to your side in next order.