China 3 Component Epoxy Resin Quartz Flooring Coate 15kg, Find details about China Floor Resin, Metallic Floor Resin from 3 Component Epoxy Resin Quartz Flooring Coate 15kg
3 Component Epoxy Resin Quartz Flooring Coate 15KG
Item | 3329 Top coating | 3328 Middle coating | 3329 Epoxy Primer |
3329Color | Transparent Liquid | Transparent Liquid | Transparent Liquid |
Thinkness | 3mm-5mm | 3mm-5mm | 3mm-5mm |
Mix Ratio(by weight) | 2:1 | 2:1 | 2:1 |
Solid Color Pogment | 0.015kg/square meter | 0.015kg/square meter | 0.015kg/square meter |
Operation time(100g mixed glue ,25ºC) | 50-60minutes | 50-60minutes | 50-60minutes |
Resin cost | 1mm 0.15kg/square meter | 2mm 0.75kg /square meter | 1mm 0.15kg/square meter |
Shelf Life | 12months | 12months | 12months |
Metallic Epoxy Floor Coating System
Features:
-----Ease of maintenance.
----Aesthrtic improvements
----VOC free, 100% Solid, No Odor
----Stain and chemical resistant
----Anti-microbial& Anti-slip
----High gloss finish like mirror
----Fast set available for quicker turn around time
----Special colors can match design or preferred colors
Apply:
Metallic Epoxy Floor Coating System
Room Temperature:
Metallic Epoxy Floor Coating System
Room Temperature in Winter:
72-80 Fahrenheit (22-26 ºC)
Customer Feedback:
Metallic Epoxy Floor Coating System
Metallic Epoxy Floor Coating System
Metallic Epoxy Floor Coating System
Metallic Epoxy Floor Coating System
Q1: Are you a manufacturer or what else?
A1:We are a professional glue and adhesive manufacturer since 1998, which is located in shenzhen,china.
Q2: May I own my own logo on the product ?
A2:Yes, we accept OEM,which both are availablefor lable,package and logo
Q3: What is the minium order quantity for this product ?
A3:MOQ is 100KGS.We also can support trial order and sample order.
Q4: How many days will you delivery the products?
A4:Generally it will take 5 days to produce the products
Q5: May I get the sample first?
A2: Yes, you can. Sample cost and shipping cost should be paid by buyer. We will provide our best price for you. Lead time is about 2-3 working days after receive the payments.