Neutral Silicone Sealant Used for Construction of Glass Curtain Walls

China Neutral Silicone Sealant Used for Construction of Glass Curtain Walls, Find details about China Silicone Sealant, Acrylic Based from Neutral Silicone Sealant Used for Construction of Glass Curtain Walls

Model NO.
ACE-169
Main Agent Composition
Neutral Silicone
Characteristic
Waterproof
Promoter Composition
Filler
Composition
Neutral Silicone
Color
White
Trademark
ACEBOND
Transport Package
Carton
Origin
China
Model NO.
ACE-169
Main Agent Composition
Neutral Silicone
Characteristic
Waterproof
Promoter Composition
Filler
Composition
Neutral Silicone
Color
White
Trademark
ACEBOND
Transport Package
Carton
Origin
China
Neutral Silicone Sealant Used for Construction of Glass Curtain Walls
Neutral Silicone Sealant Used for Construction of Glass Curtain Walls


Neutral Silicone Sealant Used for Construction of Glass Curtain Walls
 
Base Neutral silicone
ColorBlack, White, Gray, 
Packaging 

300mL/cartridge 590mL/sausage

Net Weight

398g/cartridge  791g/ sausage

Shelf Life12 months
StorageStore in the cool and dry place under 27ºC
Features

Easy to use with good tooling and non-sagging properties from 5°C to 45°C

Excellent adhesion to most building materials

Excellent weather durability, resistance to UV and hydrolysis

Wide range of temperature tolerance, with good elasticity within -50 to 150°C

Compatible with other neutrally cured silicone sealants and structural assembly systems

Applications

Structural bonding of glass curtain wall

Structural bonding of other curtain wall

Structural bonding for industrial purposes or other buildings

Limitations

ACE-169 should not be applied:

On the surface of substrate that bleeds oil, plasticizer or solvent and so on (such as impregnated wood).

In totally confined spaces.

When substrate surface temperature beyond 45º C or below 5º C.

In continuous water immersion or on the surface with fog, or wet surface, or in continuous wet place

On paint surface

Primer

Priming is usually required when using ACE-169. Moreover, sealant adhesion should always be tested in advance to determine the need for a primer. If required, primer should be applied in a thin film to the joint surface by using a clean lint-free cloth and allowed to dry before sealant application.

Curing and MaintenanceACE-169 begins curing when it contacts with the moisture in air. It generally cures 2mm/day, and takes 21 days for fully-cure. In the beginning of using the sealant, please remain the sealant places fixed and flat. Solvent can be used to clean the fractured sealants and then fill up with the new sealants with same color and quality.
Safety
It is nontoxic after entirely cured. Avoid direct contact with eyes when operating. If happened, rinse opened eye under running water for several minutes. During the curing process, sealant will release a small amount of organic molecules. Construction should ensure good ventilation. If necessary, take protective measures.

Please keep children out of reach.

 

Properties Tested as

ETAG 002:2012

GB 16776-2005

  GB 30982-2014

Item

Result

Slump

0
Tack Free time0.7h

Hardness Shore A

42

Elastic recovery

89%

Movement capability

+/- 50%  1.52MPa (23ºC)

Tensile strength

 0.8 MPa (90ºC)  2.07MPa (-30ºC)

Elongation at Break

 261%
Tensile Adhesion StrengthAt 20% elongation 0.30MPa 

At 40% elongation 0.43MPa

Guarantee

25 Years

VOC content

49g/kg 


Operation Chart
Neutral Silicone Sealant Used for Construction of Glass Curtain Walls


Neutral Silicone Sealant Used for Construction of Glass Curtain Walls

 

FAQ 

1, Q:Are you manufacture or simply trading company ?

A: We are the manufacture , welcome you visit our factory.


2,Q: Do you provide free samples ?

A:We do provide free samples under the condition that you assume the express shipping cost 


3,Q: How to place order ?

A: Please tell us the service you need, OEM or ODM, and the quantity , then we will make the PI for you. 


4,Q: How did you test the product before they are packed?

A :We have the strict QC procedure , each product will be tested by three times with professional machine before packing. 


5,Q:What's the delivery time ?

A: Usually 15-20 days after receiving deposit .


6,Q:Where is the shipping port ?

A:We ship the products via Huangpu port, Guangzhou or any other ports depend on your needs.


7,Q: What about the payment terms ?

A: 30% TT advanced payment , balance need to pay before shipment.