10min Respirator for Fire Fighting Equipment

China 10min Respirator for Fire Fighting Equipment, Find details about China Respirator, Fire Fighting Respirators from 10min Respirator for Fire Fighting Equipment

Port: Shanghai, China
Payment Terms: L/C, T/T, Western Union
Mask Application: Security Mask
Material: Superfine Fiber
Specification: 10/15mins
Trademark: Longyear Marine
Origin: China
10 minute/15 minute emergency escape air respirator
Detailed description:
Equipment used to escape heavily polluted and oxygen-deficient areas.
A pressure gauge is installed on the gas cylinder. When the valve of the gas cylinder is closed, the pressure value in the cylinder can still be read.
Gas supply method: stable gas direct supply mask or hood
Gas supply time: not less than 10 minutes
Type:
Full-face mask with a large field of view
Headgear A headgear that covers the head, neck, and shoulders and has a bright viewing window.
Simple operation: just put on the mask or open the cylinder valve. Weight less than 6kg
technical parameter:
ModelAir Cylinder VolumeNormal working PressureDurationApproval
LY10M2L21Mpamore than 10 minsCCS/EC
LY15M3L21Mpamore than 15 minsCCS/EC
10min Respirator for Fire Fighting Equipment
10min Respirator for Fire Fighting Equipment
10min Respirator for Fire Fighting Equipment10min Respirator for Fire Fighting Equipment

Q: What are the available shipping methods?

A: Port location: Ningbo or Shanghai, China Shipping to: Worldwide Shipping method: by sea, by air, by express Estimated delivery dates depend on specific order list, shipping service selected and receipt of cleared payment. Delivery time may vary.

 

Q: What payment methods are supported?

A: Payment: By T/T, Western Union, Money Gram for samples 100% with the order, for production,30% paid for deposit by before production arrangement, the balance to be paid before shipment. Negotiation is accepted.

 

Q: How to control the quality of Ruihua Products?

A: Products Material: Strictly control the material used, make sure they can meet international requested standards, and maintain long working life.
Semi-finished products inspection: We examine the proudcts100% before finished. Such as Visual Inspection, Thread testing, Leak Testing, and so on.
Production line test: Our engineers will inspect machines and lines at fixed period.
Finished Product Inspection: We do the test according to ISO19879-2005, leakage test, proof test, re-use of components, burst test, cyclic endurance test, vibration test, etc.
QCTeam:A QC team with more than 10 professional and technical personnel. To ensure 100% products checking.

 

Q: How long is the product date of delivery probably?

A: The different product, as well as the diferent run quantity can affect the date of delivery, but in ordinary circumstances product date of delivery about 30 days. Most of products have stock, contact us anytime to get more information.

 

Q: How to Custom-made(OEM/ODM)?

A: If you have a new product drawing or a sample, please send to us, and we can custom-made the product as your required. We wllalso provide our professional advices of the products to make the design to be more realized & maximize the performance.

 

Q: How about the mini order quantity?

A: We don't have strict requirments on most items, due to we have stock. More information can send us the enquiry list, we check and reply you. For custom-made, MoQ will be adviced due to the specific product.