China Temporary Econimic Prefab Portable Modular Living Container House Design, Find details about China Container House, Prefab House from Temporary Econimic Prefab Portable Modular Living Container House Design
Size: | 5800*2400*2896mm |
Steel structure: | Bending steel plate |
Wall: | 50/75/100mm EPS sandwich panel /rock wool sandwich panel, 0.326/0.376/0.426/0.476mm steel sheet |
Wall color: | White color and optional colors |
Roof: | 50mm EPS sandwich panel /rock wool sandwich panel, 0.326/0.376/0.426/0.476mm steel sheet |
Door: | 50mm EPS sandwich panel /rock wool sandwich panel, 0.326/0.376/0.426/0.476mm steel sheet with lock /optional doors |
Window: | Aluminum sliding door, PVC sliding door with security bar |
Floor: | MGO board /optional floor |
Decoration wall: | Optional: PVC cladding, WPC cladding |
Electricity: | Optional standard |
Install Time: | 4 workers 3 hours |
Wind resistance: | Wind speed≤120 km/h |
Earthquake resistance: | Grade 8 |
Snow load capacity of roofing: | 0.6kn/m2 |
Live load capacity of roofing: | 0.6kn/m2 |
Wall permitted loading: | 0.6kn/m2 |
Heat conductivity coefficient: | 0.35kcal/m2hc |
Delivery time: | About 15-20 working days |
Container loading: | 8 sets/1*40HQ |
1.24 hours on line &one to one service, solve your problem efficiently.
2. Professional installation team and site engineers for foreign countries.
3. Customers are warm welcomed to visit our factory at any time, even during holidays.
4. Perfect arrangement for customers from Hotel booking to product shipping.
1. Q: Are you a factory or trading company?
A: Guangzhou Moneybox Steel Structure Engineering Co., Ltd. is a factory located in Panyu district, Guangzhou, Guangdong province.
2. Q: What's your supply capacity?
A: Annual Production: Container house 72000sets, prefab house 564000square meters; Portable toilet 24000sets; Steel structure 360000square meters.
3. Q: How to install?
A: We will provide installation instruction and video for you, technicians will be sent to help you if it is necessary. However, the visa fee, air tickets, accommodation, wages will be provided by buyers.
4. Q: How long is your delivery time?
A: Generally it is within 2-30 days, definitely according to quantity and color.
5. Q: How do you guarantee the quality of the products?
A: Strict product quality control, quality makes the future. This is the tenet of our factory. Each product from our factory has strict testing procedures, and must be 100% quality before delivery.
6. Q: How can I get the quotation of the project?
A: If you have drawing, we can offer you our quotation according to your drawing.
If you have no design, Our engineer will design some drawings for you to confirm. And then offer you a quotation.