Construction Site Labour Camp Mobile Temporary Office Building Design Modular House

China Construction Site Labour Camp Mobile Temporary Office Building Design Modular House, Find details about China Modular House, Steel Frame Modular Homes from Construction Site Labour Camp Mobile Temporary Office Building Design Modular House

Model NO.
WH2019071902
Wall & Roof
EPS/Rock Wool / Glass Wool /PU Sandwich Panel
Used
Construction Site, Temporary Office, Dormitory, Wa
Storey
Single Storey, Two Storey, Three Storey
Life Span
Against with Corrosion and Durable in 15 Years.
Layout
The Position of Windows and Doors Can Be Arranged
Environment-Friendly
Prefab House Could Be Assembling and Disassembling
Product Name
Sandwich Panel Prefabricated House
Trademark
Vanhe
Transport Package
Nude Packing
Specification
customized
Origin
China
HS Code
9406900090
Model NO.
WH2019071902
Wall & Roof
EPS/Rock Wool / Glass Wool /PU Sandwich Panel
Used
Construction Site, Temporary Office, Dormitory, Wa
Storey
Single Storey, Two Storey, Three Storey
Life Span
Against with Corrosion and Durable in 15 Years.
Layout
The Position of Windows and Doors Can Be Arranged
Environment-Friendly
Prefab House Could Be Assembling and Disassembling
Product Name
Sandwich Panel Prefabricated House
Trademark
Vanhe
Transport Package
Nude Packing
Specification
customized
Origin
China
HS Code
9406900090

Construction Site Labour Camp Mobile Temporary Office Building Design Modular House


 
Product description
ItemK houseT house
DimensionWidth*Length*Height=MK*NK*AP
(M=3,4,5,  N>=3,  A=3,6,9,  K=1820mm, P=950mm)
      Customize
MaterialStructure: Light steel structure
Wall & Roof:EPS/Rock wool / glass wool /PU sandwich panel
UsedConstruction site, Temporary office, Dormitory, Warehouse, and so on
StoreySingle storey, two storey, three storey
Life spanAgainst with corrosion and durable in 15 years.
LayoutThe position of windows and doors can be arranged at any place, interior wall could be adjusted as need.
Environment-friendlyPrefab house could be assembling and disassembling 5~10 times without construction waste.

 


Construction Site Labour Camp Mobile Temporary Office Building Design Modular House


Construction Site Labour Camp Mobile Temporary Office Building Design Modular House