Insulated Glass Production Line Lifting Table for Alu. Frame Mounting Jumbo Glass Size

China Insulated Glass Production Line Lifting Table for Alu. Frame Mounting Jumbo Glass Size, Find details about China Insualting Glass Machine, Lifting Table from Insulated Glass Production Line Lifting Table for Alu. Frame Mounting Jumbo Glass Size

Lifting Height
1035mm
Trademark
DETEK
Transport Package
Seaworthy Package
Origin
China
HS Code
8464901900
Lifting Height
1035mm
Trademark
DETEK
Transport Package
Seaworthy Package
Origin
China
HS Code
8464901900
Insulated Glass Production Line Lifting Table for Alu. Frame Mounting Jumbo Glass Size
Insulated Glass Production Line Lifting Table for Alu. Frame Mounting Jumbo Glass Size

Lifting table with separate hydraulic station as the driven force, foot switch for up and down by operator.


Technical parameter
Power supply3P 380V 50HZ
Total power1.5 kw
Platform size450×4000mm or customized
Max. height of platform1035mm
Insulated Glass Production Line Lifting Table for Alu. Frame Mounting Jumbo Glass Size

Insulated Glass Production Line Lifting Table for Alu. Frame Mounting Jumbo Glass Size
Insulated Glass Production Line Lifting Table for Alu. Frame Mounting Jumbo Glass Size
Insulated Glass Production Line Lifting Table for Alu. Frame Mounting Jumbo Glass Size
Insulated Glass Production Line Lifting Table for Alu. Frame Mounting Jumbo Glass Size

Mostly asked questions below:

1. What is your soonest lead time?
  A: 60 days for whole production line, 30 days for single machine.  Special requirement pls check with sales.

2. How do you arrange the shipment?
  A: all machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.

3. Guarantee ?
  A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.

4. How we can install the machines?
  A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.

5. How about the after service?
  A: Spare parts within 72 hours.
     Experienced technical sales sort out most of your questions.
    Tens of service engineers ready for on-site service and instruction.