Paper Pulp Molding Apple Tray Making Machine / Egg Box Making Machine

China Paper Pulp Molding Apple Tray Making Machine / Egg Box Making Machine, Find details about China Apple Tray Machines, Coffee Tray Machines from Paper Pulp Molding Apple Tray Making Machine / Egg Box Making Machine

Model NO.
F-2500
Condition
New
Voltage
220V/380V
Motor Power
3kw
Template Size
1.47m X 0.47m
Operating Speed
10times /Minute
Overall Dimension
3.1m X 1.7m X 1.8m
Paper Consumption /Hr
110kg~175kg
Vacuum Pump
22kw
Pulper
7.5kw
Drying
19kw
Production
2200~3000pieces
Trademark
SH
Transport Package
Nude Package or Export Standard Package
Specification
4-4
Origin
China
HS Code
8441400000
Model NO.
F-2500
Condition
New
Voltage
220V/380V
Motor Power
3kw
Template Size
1.47m X 0.47m
Operating Speed
10times /Minute
Overall Dimension
3.1m X 1.7m X 1.8m
Paper Consumption /Hr
110kg~175kg
Vacuum Pump
22kw
Pulper
7.5kw
Drying
19kw
Production
2200~3000pieces
Trademark
SH
Transport Package
Nude Package or Export Standard Package
Specification
4-4
Origin
China
HS Code
8441400000
Paper Pulp Molding Apple Tray Making Machine / Egg Box Making Machine
Paper Pulp Molding Apple Tray Making Machine / Egg Box Making Machine
popular and best quality chicken box making machine /egg box making machine 


Product Details
ModelProduction
/day
 
MoldTotal power
 
Labor forcePaper consumedVacuum 
pump
 
PulperDrying 
equipments
4-8type72000pieces32chunks85kw5-7person3.5-4.5T30kw11kw19kw
3-8type55000pieces24chunks72kw5-7 person 3-4T26kw7.5kw19kw
5-8type
 
90000pieces40chunks110kw5-7person4.5-5.5T36kw22kw21kw
 
Advantages:
1. High efficiency,low energy consume,low noise
2. Easy to operate, low labor force cost,large output
3. Stable final product quality(same weight,dimension,good look)
4. Professional technical support,superior after-sales service
5. Medium investment,high profit
6. optional color
7. excellent after-sales service

Machine can produce products 


our factory 

 
Our Services
A: The Seller will send two engineers to the buyer's factory, they are responsible for the
instruction of installing machine and training the operator until the machine working
normally. All the expenses out of china (including the round-trip air tickets, foods and
hotel, salary 70usd/day/enginner) should be borne by the buyer. The buyer should
prepare onetranslator for our engineers to communication.   
B: Forming machine warranty time: 12 month.
(not including the mould and quick-wear parts)
 The seller will provide below quick-wear parts for free to buyer:
Proximity switch --10 units.
Solenoid valve -1 unit (10 leather packing)
Mold core -10 boxes
C: Within 3 months, if Vacuum pump, motors or Air compressor was broken because of
the quality of machine itself, the buyer should send the problem part back to seller , the
seller will provide the new one immediately. But as for the wrong operation of the
workers, the seller will not be responsible for them.
D: After guarantee period the Seller will send engineer on the Buyer's request. All the
expenses of this engineer will be borne by the Buyer's company, and service charge
will be negotiated by the Buyer and the Seller.

Packaging & Shipping
FAQ
 RAQ
1.What kinds of machines do you produce?
(1)pulp moulding machines,egg tray machines,egg packing machines,egg box/carton
machines,fruit tray machines,industrial machines, seeding tray machines .and the
whole production line etc.
(2)all kinds of moulds ,such as egg tray moulds,egg box/carton moulds, fruit tray
moulds,seeding tray moulds,industrial moulds etc.
(3)drying line
2.What capacity per hour do you offer ?
Our machines' capacity is from 1000pcs/hr to 10000pcs/hr.
3.Do your products come with a warranty ?
Yes , we have one year warranty according the international practice.
4.Can I customize this kind of product from your factory?
Yes ,we offer custom-made service to our customers, you need to provide us some
samples,such as photos,dimensions etc.
5.Can you give me a low price?
Yes,we are the manufacturer, at the same moment we guarantee the quality, we will
give you a lower price.
6.How to install?
The seller dispatches engineers to buyer's factory. Buyer should help installation.
Seller is responsible for installation, testing and training for 30 days, the buyer should
insure the safety of the engineers.