Hard Chrome Hydraulic Pneumatic Honed Tube E355 E410 E470 Cold Rolled and Cold Drawn Seamless Honed Tube

China Hard Chrome Hydraulic Pneumatic Honed Tube E355 E410 E470 Cold Rolled and Cold Drawn Seamless Honed Tube, Find details about China Cold Rolled Honed Tube, Cold Drawn Honed Tube from Hard Chrome Hydraulic Pneumatic Honed Tube E355 E410 E470 Cold Rolled and Cold Drawn Seamless Honed Tube

Model NO.
Tube
ID Range
26-800mm
Straightness
0.5/1000mm
Trademark
HYDSTEELS
Transport Package
Wooden Case, Container
Specification
20GP, 40HQ
Origin
Wuxi, China
HS Code
8483109000
Model NO.
Tube
ID Range
26-800mm
Straightness
0.5/1000mm
Trademark
HYDSTEELS
Transport Package
Wooden Case, Container
Specification
20GP, 40HQ
Origin
Wuxi, China
HS Code
8483109000
We make honed tubes, Honed steel tubing, Hydraulic cylinder tubes, Skived tubes, Bored tubes; Chrome plated piston rods, Chrome bars, Linear shaft, Hollow rods; Cold drawn tubes, Pre-hone tubes, Ready to hone tubes.

1. Product Show
Honed tube for hydraulic cylinder
StandardDIN2391, EN10305, JIS G3445, ASTM A519, GB/T 8713...
MaterialST45, ST52, E355, E355SR, STKM13C, SAE1026, 20#, Q235B, CK45...
Heat treatmentBK+S
SpecificationOuter diameter(mm)Inner diameter(mm)
40-480mm30-400mm
I. D ToleranceH8-H9
Length3-9m (Customers usually choose the 4~5.8m)
Straightness1/1000
ID roughnessRA 0.4micron(max)
TechnologyHoned & SRB(SKIVED AND ROLLER BURNISHED )
ScopeHoned tube for hydraulic cylinder, swivel crane, injection machine and
Construction machine application

2. Product Pictures
 
Hard Chrome Hydraulic Pneumatic Honed Tube E355 E410 E470 Cold Rolled and Cold Drawn Seamless Honed TubeHard Chrome Hydraulic Pneumatic Honed Tube E355 E410 E470 Cold Rolled and Cold Drawn Seamless Honed Tube

3.Production Processes

Hard Chrome Hydraulic Pneumatic Honed Tube E355 E410 E470 Cold Rolled and Cold Drawn Seamless Honed Tube
4. Packing

Hard Chrome Hydraulic Pneumatic Honed Tube E355 E410 E470 Cold Rolled and Cold Drawn Seamless Honed Tube
5.Company Show
Factory was established under modern management system and technologies. It covers an area of 40,000 sq. meters, meters and building area of 30,000 sq. meters. All processing control include cold-drawn, heat treatment, honing, peeling, grinding, polishing. There are 50sets of advanced equipment and80+ skilled technical workers, annual output over 30,000tons.The quality of the produced honed tube is very good

Hard Chrome Hydraulic Pneumatic Honed Tube E355 E410 E470 Cold Rolled and Cold Drawn Seamless Honed Tube
6. Our advantage
>15+years professional manufacturer & supplier of honed tube, Chrome plated rod. 
>Experience in Vietnam, Thailand, Brazil, Egypt, Saudi Arabia, UAE, Russia, Singapore market.
>ISO9001:2008, SGS, BV, CNAS Certificated. 
>Biggest manufacturer & wholesaler in local market. 
>7*24 at your service, on time respond. 
>One-stop collection.

7.FAQ

Q: Are you trading company or manufacturer? 
A: manufacturer
Q: How long is your delivery time? 
A: Generally it is 5-10 days if the goods are in stock. Or it is 30 ~40days if the goods are not in stock, it is according to quantity. The more the quantity is, the shorter the delivery will be. 
Q: Do you provide samples? Is it free or extra? 
A: Yes, we The inventory can be provided free of charge, but the freight will need to be borne by you
Q: What is your terms of payment? 
A: T/T or L/C according to real order. 
Q: What is your terms of payment? 
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, balance before shippment.


Contact Us
Frank