Psb 400/ 500/ 830/ 1080 Steel Rebar Deformed Steel Bar Iron Rods Steel Rebar for Construction

China Psb 400/ 500/ 830/ 1080 Steel Rebar Deformed Steel Bar Iron Rods Steel Rebar for Construction, Find details about China Building Material, Hot Rolled Rebar from Psb 400/ 500/ 830/ 1080 Steel Rebar Deformed Steel Bar Iron Rods Steel Rebar for Construction

Model NO.
400/ 500/ 830/ 1080
Diameter
6mm-40mm
Technique
Hot Ribbed Steel Rebar
Tolerance
+/-1%
Price Term
Fob, EXW, CFR, CIF, etc.
Delivery Time
7 Days
Grade
Hrb355 HRB400 HRB500
Specifications
SGCC, Sgch, G550, Dx51d, Dx52D, Dx53D, etc.
Trademark
RanSheng
Transport Package
Standard Packing or Customized
Origin
Tianjin, China
HS Code
7208512000
Model NO.
400/ 500/ 830/ 1080
Diameter
6mm-40mm
Technique
Hot Ribbed Steel Rebar
Tolerance
+/-1%
Price Term
Fob, EXW, CFR, CIF, etc.
Delivery Time
7 Days
Grade
Hrb355 HRB400 HRB500
Specifications
SGCC, Sgch, G550, Dx51d, Dx52D, Dx53D, etc.
Trademark
RanSheng
Transport Package
Standard Packing or Customized
Origin
Tianjin, China
HS Code
7208512000

Product Name
Deformed Steel Rebars,Rebar
MaterialQ195, Q235, Q345; ASTM A53 GrA,GrB; STKM11,ST37,ST52, 16Mn,etc.
Size6mm,8mm,10mm, 12mm, 13mm, 14mm, 16mm, 20mm, 22mm, 25mm, 30mm, 32mm, 40mm,50mm
Length5m-14m,5.8m,6m,10m-12m,12m or as customer's actual reques
StandardBS4449-2005,GB1449.2-2007,JIS G3112-2004, ASTM A615-A615M-04a,
GradeGrade A, Grade B, Grade C
Section ShapeSpiral Shap,Herringbone Shap,Crescent Shap
TechniqueSteel Rebar Iron Rod
PackingBundle, or with all kinds of colors PVC or as your requirements
EndsPlain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.
Surface Treatment

1. Galvanized

2. PVC,Black and color painting

3. Transparent oil,anti-rust oil

4. According to clients requirement

Origin

Tianjin OF China

CertificatesAPI ISO9001-2008,SGS.BV 
Delivery Time

Usually within 15 days after receipt of advance payment 

DiameterInner diameterOut diameterTheoretical   weight
(mm)(mm)(mm)(kg/m)
65.756.750.222
87.590.395
109.311.30.617
1211130.888
141315.51.209
161517.51.579
1817202
2019222.468
2221242.986
2524273.856
2826.530.54.837
3230.534.56.318
 
6mm, 8mm, 10mm will be coil, more than 10mm will be straight steel bar.
If you need 6mm, 8mm, 10mm make it 6m or 12m, we can make it straight.
For the sizes more than 10mm, normal it will be 12m, if you need 6m, we can cut it to 6m.
Building Material Reinforcement Structural Reinforcing Hot Rolled Rebar Steel Ribbed Bar Iron Rods for Construction Iron Deformed Rods Steel Rebar
Building Material Reinforcement Structural Reinforcing Hot Rolled Rebar Steel Ribbed Bar Iron Rods for Construction Iron Deformed Rods Steel Rebar
Building Material Reinforcement Structural Reinforcing Hot Rolled Rebar Steel Ribbed Bar Iron Rods for Construction Iron Deformed Rods Steel Rebar
Building Material Reinforcement Structural Reinforcing Hot Rolled Rebar Steel Ribbed Bar Iron Rods for Construction Iron Deformed Rods Steel Rebar
Regular diameters and cross-sectional areas
 
Permissible variation in weight, %
Regular diameter, mm
Regular cross-sectional area F, mm2
Weight per 1m of the length, kg
DIN
BS
EN
6
28,3
0,222
6/-4
±6
±6
8
50,3
0,395
6/-4
±6
±6
10
78,5
0,617
6/-4
±4,5
±4,5
12
113,1
0,888
6/-4
±4,5
±4,5
14
154
1,21
6/-4
-
±4,5
16
201
1,58
6/-4
±4,5
±4,5
20
314
2,47
6/-4
±4,5
±4,5
25
491
3,85
6/-4
±4,5
±4,5
28
616
4,83
6/-4
-
±4,5
32
804
6,31
6/-4
±4,5
±4,5
40
1256,6
9,86
6/-4
±4,5
±4,5

Building Material Reinforcement Structural Reinforcing Hot Rolled Rebar Steel Ribbed Bar Iron Rods for Construction Iron Deformed Rods Steel Rebar

1.What kind of work does your company do?
Our company is a professional manufacturer.We have our own factory, and we mainly produces plate/pipe/coil/round bars of Steel or Aluminum

2.Do you provide free samples?
Yes, we can provide free sample for testing.

3.How long is your delivery time?
Generally it is 3-7 days if the goods are in stock or it is 7-15 days if the goods are not in stock, it is according to quantity.

4.How can we guarantee quality?
Always a pre-production sample before mass production;always final Inspection before shipment.

5.Why should you buy from us not from other suppliers?
Diversified products, direct supply from manufacturer.

6.What is your terms of payment ?
We accept T/T ,L/C ,D/A,D/P, Western union, paypal ,Alibaba Credit Insurance Order etc.The
payment method can be negotiated by both parties according to the actual situation.