2.5 Inch Fire Fighting Landing Valve for Fire Protection System

China 2.5 Inch Fire Fighting Landing Valve for Fire Protection System, Find details about China Indoor Fire Hydrant Cabinet Fire Hose, Used Fire Hydrants for Sale Fire Hydrants from 2.5 Inch Fire Fighting Landing Valve for Fire Protection System

Model NO.
FRD-OF65
Working Pressure
16
Size
2.5",DN65
Outlet
2.5"BS336 Female Inst
Material
Copper Alloy
Trademark
forede
Transport Package
Cartoon
Specification
37*23*21
Origin
Fujian, China
HS Code
8481804090
Model NO.
FRD-OF65
Working Pressure
16
Size
2.5",DN65
Outlet
2.5"BS336 Female Inst
Material
Copper Alloy
Trademark
forede
Transport Package
Cartoon
Specification
37*23*21
Origin
Fujian, China
HS Code
8481804090

Product Description

Oblique thread landing valve is made of copper alloy, the blank cap also made of copper alloy. The stem material of flange end oblique hydrant landing valve is brass. It can be used as the valve to control the flow.

Oblique thread landing valve is part of fire sprinkler system. It does the function as the gate valve, but control the flow slow than gate valve. This product is British standard hydrant landing valve.

Oblique thread landing valve is made of copper alloy and the test pressure of body is 22.5 bar.


 

2.5 Inch Fire Fighting Landing Valve for Fire Protection System
2.5 Inch Fire Fighting Landing Valve for Fire Protection System
ModelFRD-OF65
Working Pressure16 Bar
Inlet Size2.5"(DN65) BS Flange End/ Thread End
Outlet Size2.5" BS336 Female (INST.)
 

Features:
 

1.Manufactured to BS5041 Part 1

2.Body: Copper Alloy to EN 1982

3.Hand Wheel:Grey Cast Iron to BS EN 1561

4.Blank Cap:Copper Alloy to EN 1982

5.Disc assembly: Brass W/ replaceable facing rubber
6.Stem:Brass

7.Chains:SUS304

8.Cap:ABS Plastic
 

Application:

−Marine Sectors
−Industrials
−Waste Recycling
−Bio-Mass Plants
−Timber Yards

FAQ

Q:What is the minimum order quantity of the product?
A:For conventional products, Low MOQ.
Q:Can I have a sample order?
A:Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q:What about the lead time?
A:Sample needs 7-15 days, mass production time needs 30-40 weeks for order quantity more than 1 container.