China Top Quality Two Storey Prefabricated House for People Living/Prefab Labour Camp, Find details about China Modular Home, Modular House from Top Quality Two Storey Prefabricated House for People Living/Prefab Labour Camp
Top Quality Two Storey Prefabricated House for People Living/Prefab Labour Camp
Modular buildings, also called prefabricated homes or precision built homes, are built to the same or higher building standards as on-site stick-built homes. Modular homes are built the same and considered the same as a stick built home.
Name | modular prefabricated building / steel fabricated buildings |
Material | Q235B,Q345B, Galvanized, Color Coated |
Main frame | solid H-shape steel Beam |
Purlin | C,Z-shape steel purlin |
Roof and wall | a) Color-coated corrugated steel sheet; b) Rock Wool Sandwich Panels; c) EPS Sandwich Panels; d)Glass wool Sandwich Panels |
Door | a)Rolling Gate; b)Sliding door |
Window | PVC Steel or Aluminum Alloy |
Down spout | Round pvc pipe |
Usage | All kinds of industrial workshop, warehouse, supermarket, high-rise building, etc |
Service life | 50Years |
Modular buildings are argued to have advantages over conventional buildings, for a variety of reasons.
Speed of construction/faster return on investment.
Indoor construction.
Ability to service remote locations.
Low waste.
Environmentally friendly construction process.
Flexibility.
Modular buildings may be used for long-term, temporary or permanent facilities, such as construction camps, schools and classrooms, civilian and military housing, and industrial facilities. Modular buildings are used in remote and rural areas where conventional construction may not be reasonable or possible. Other uses have included churches, health care facilities, sales and retail offices, fast food restaurants and cruise ship construction. They can also be used in areas that have weather concerns, such as hurricanes.
Modular components are typically constructed indoors on assembly lines. Modules' construction may take as little as ten days but more often one to three months. Completed modules are transported to the building site and assembled by a crane. Placement of the modules may take from several hours to several days.