China 144mva 35kv Furnace Transformer for Metallurgical Electric Arc Furnace Transformer, 30mva Reactor Power Supply Steel Industrial Furnace, Find details about China Furnace Transformer, Transformer from 144mva 35kv Furnace Transformer for Metallurgical Electric Arc Furnace Transformer, 30mva Reactor Power Supply Steel Industrial Furnace
1.1.2 TRANSFORMER DATA | |
General data | |
Operating Voltage | 33KV±3% |
Frequency | 50Hz±1% |
Rated capacity | 144 MVA |
Over load power | 144MVA plus 20%,30 min. |
Rated primary current | 1049.7 A |
Insulation Level (AC/LI) | 85/200 kV |
Vector group | D/d0 with booster regulation transformer inside. |
Secondary connection | Delta OPEN |
System short circuit capacity at 33kV side. | 1100 MVA |
Secondary outlet | Terminals with Bus bars come out from top cover. 8 Buss bars by epoxy resin arranged along with each phase with matching cite transformer sizes. |
Max. Secondary current | Approximate 42120 A |
Secondary voltage range | 950-500 V. |
a) Constant power | 950V-822.4 V at 60 MVA |
b) Constant current | About 42062 A within 824V-500V |
c) Short-circuit voltage | 8 % (at 950V,60MVA) |
Type of tap changer | On load tap-changer: |
a) Manufacturer | MR, |
b) Number of tapes | 17 voltage steps with 18position See attached data sheet of 60 MVA EAF transformer. |
c) Oil filter equipment for OLTC | yes |
Cooling | OFWF |
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testing. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months guarantee period normally. |