Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel Making Machine

China Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel Making Machine, Find details about China Steel Roll Forming Machine, Rolling Machine from Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel Making Machine

Model NO.
zh
Automatic Grade
Automatic
Type
Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal
Speed
40m/Min
Motor
7.5kw
Servo Motor
1.5kw
Rollers
Cr12
Cutting
Non Stop
Blade
Cr12 MOV
Voltage
380V
Control System
PLC Xinjie
Decoiler
2.5ton
Delivery Time
30 Days
Trademark
ZH
Transport Package
Full Assmebled
Specification
4.5X0.85X1.4
Origin
Hebei, China
HS Code
8455221000
Model NO.
zh
Automatic Grade
Automatic
Type
Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal
Speed
40m/Min
Motor
7.5kw
Servo Motor
1.5kw
Rollers
Cr12
Cutting
Non Stop
Blade
Cr12 MOV
Voltage
380V
Control System
PLC Xinjie
Decoiler
2.5ton
Delivery Time
30 Days
Trademark
ZH
Transport Package
Full Assmebled
Specification
4.5X0.85X1.4
Origin
Hebei, China
HS Code
8455221000
Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel Making Machine
Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel making machine
Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel Making Machine

Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel Making Machine
Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel making machine Specifications
Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel Making Machine
Material

                                      

Effective width:About 25 mm  
Material Thickness:0.3-0.6mm                                   
Applicable material:Galvanized Steel(GI),Hot Roll Steel(HRC),With yield strength G235-390Mpa



Work Follow

Decoiler→Feeding Guide Device→Rolling Forming System→Hydraulic Not Stop Cutting And Punching Device→ Exit Rack

Machine Components 

Manual Decoiler  1 Set 

Un-powered, Manually control steel coil inner bore shrinkage and stop
Max Feeding width: 500mm,coil ID range ф460-520mm
Capacity:Max 2 Tons*2
Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel Making Machine


Main Roll forming machine 

Forming mold: Cr12MoV molding steel, through vacuum quenching heat treatment to HRC60-62 °then grinding the inner 
Hole and the end face. The precision machining roller surface with CNC lathe
Shafts material:40Cr steel,CNC lathes,Heat Treatment,hard Chrome Coated
With thickness 0.04mm,surface with mirror treatment(for longer life and anti-rust)
Main motor and 14 reducers combination driving,about 14-step to form           
Main Motor =5.5KW,Frequency speed control
Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel Making Machine Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel Making Machine

Non stop cutting and punching

Cutter stype:Not stop cutting and punching 
The length of tolerance:±1.0mm(3m)
Cutter motor:Hydraulic
Servo motor power:3 KW
Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel Making MachineSteel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel Making Machine

 

Control System 

Control The Quantity And Cutting Length Automatically
Input The Production Data(Production Batch,pcs,Length,etc.)On The Touch Screen ,
It Can Finish The Production Automatically.
Combined With: PLC, Inverter, 10 Inch Touch Screen, Encoder, etc

Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel Making Machine

After-sale service of stud and track roll forming machine 

1. The warranty of roll forming machine is two years .after the client receives the machine. Within the Two years, 
we will courier the replacement parts to the client free of charge.
2. We offer technical support for the entire life of our machines.
3. We can send our technicians to install and train the workers in the clients' factories with extra cost.


Terms of trade 

1. Minimum order quantity (MOQ): 1 piece
2. Delivery time: about 40 workdays
3. Port of loading: port of Tianjin
4. Type of payment: by T/T or by L/C


More Roll Forming Machine for reference , welcome to send us Inquiry .
Steel Galvanized 3-5/8" Metal Studs 24 Gauge Metal Stud Drywall C Channel Steel Making Machine