1. Technical Documents
1.1 Basic Requirement
1.1.1 Loading type: no basket, automatic feeding
1.1.2 Energy source: nature gas
1.1.3 Running method: roller conveyor type, 3 layers conveying, completely continuous operation
1.1.4 Layout: the line is arranged in U-shape
1.1.5 Utility condition
:a) Power
: 3phase ,AC380/220 V±10% 50Hz
b) Working temperature
: -5~45
ºCmaximum relative humidity
:85%
c) Compressed air
:0.4~0.6 MPa
d) Water pressure :0.2~0.3MPa
e) Nature gas pressure:0.04~0.1MPa
calorific value:8200~8400kcal/Nm
31.2 Equipment Functional Requirement
1.2
1.2.1 Process requirement: meet the Al. wheel T6 heat treatment process requests
1.2.2 solution furnace:
50min +230min =280min
(200min
~360min
)50min heating + 230min holding= 280min inside furnace (200min ~360min, adjustable )
1.2.3 Aging Furnace
30min heating + 170min holding = 200min inside furnace (120min ~ 270min adjustable )
1.2.4 production capacity of each line1.3
Production rate: 1,000,000pcs/year
,(24h/day, 300workding days/year, specific wheel size: 17×10 inch,
φ476mm
)Hourly production rate: 1000000÷300÷24=138.89pcs /h
Each cycle loaded wheels number:
one layer loaded with 5 wheels, 3 layers,
5×3=15pcs
Hourly working cycles: 138.89÷15 =9.266 cycle /h
Cycle time : 60÷9.266=6.48min
1.3 detailed data of working cycle
Annual production rate | 1,000,000 | pcs/year |
Working days | 300 | Day |
Working hours | 24 | H |
Hourly production rate | 138.89 | pcs/h |
Layers of roller conveyor | 3 | Layer |
Wheel numbers per layer | 5 | Pcs |
Cycle time | 6.48 | min/cycle |
solution furnace |
Specific heating up time | 50 | min |
Specific holding time | 230 | min |
Specific wheel size (diameter ) | :476 | Mm |
Distance between each row of wheels | 100 | Mm |
Furnace length | 26089 | Mm |
Transfer speed of parts inside furnace chamber | 88.9 | mm/min |
aging furnace |
Specific heating up time | 30 | Min |
Specific holding time | 170 | Min |
Specific wheel size (diameter ) | 476 | Mm |
Distance between each row of wheels | 100 | Mm |
Furnace length | 18978 | Mm |
Transfer speed of parts inside furnace chamber | 88.9 | mm/min |
2. Supply Scope
No. | Item | Unit | Qty |
1 | Layering Feeder | 1 | set |
2 | Feeding of solution furnace | 1 | set |
3 | Solution furnace | 1 | set |
4 | Quenching unit and quenching transfer unit after quenching | 1 | set |
5 | Transfer unit and water drain unit | 1 | set |
6 | Aging furnace feeding unit | 1 | set |
7 | Aging furnace | 1 | set |
8 | Discharging unit | 1 | set |
9 | Layering unloading unit | 1 | set |
10 | Combustion system | 6 | set |
11 | Chimney (5 meters higher above the workshop building) | 1 | set |
12 | Control system | 1 | set |
13 | Solution furnace heat-recovery unit | 1 | set |
14 | Central Integrated Control System (exclude the control room ) | 1 | set |