Automatic chipboard/partical board/particle board machinery production line
1) Chip preparation section
Raw material is reduced into qualified chips by the drum chipper, then the chips are transported to the chip bin, and then feed to the knife-ring flaker by which the chips are turned to flakes,then the flake stored in wet flake bin
2) Drying and sifting section
The flskes discharged from the wet flake bin are conveyed to the rotary dryer. Qualified core flakes are stored in core flake bin; oversize flakes are send to mill to be re-crushing, and transported to surface flake bin.
3) Forming and hot-pressing section
The surface and core flakes are sent into classi-forming machine, and forming on the mat conveyor uniformly. After process of metal remover , pre-press, lengthwise saw, cross saw, accelerate conveyor,scaling conveyor , storing conveyor and loading conveyor,mats are transported to carrier and then to hot pressing. Rough boards after pressing are pushed to unloader via pallet.
4) Cooling and sizing section
The rough board is conveyed to star-cooler for cooling ,then the rough board goes through side trimming saw and become a qualified particle-board, stacked on the hydraulic lift.
5) Sanding section
The board are sanded,checked and stored.
PLC control is used in mat-forming section.
Additional Equipment
NO. | EQUIPMENT | SPECIFICATION |
1 | heat-conducting oil boiler | Heat supply capacity: 1,200,000 kcal/h, weldless pipe: 20000mm, spare parts |
2 | 3-head sander | Pipe: 20000mm elbows: 40#, 4 pcs |
3 | air blower | electric motor: 15kw |
4 | air compressor | 0.6 m3 |
5 | dust silo | 10 m3, supplied by buyers |
6 | stop block | 8mm, 13mm, 16mm, 20mm |
7 | cold steel | Thickness:2.5mm |
8 | lift | electric motor: 3kw |
9 | reaction kettle | Capacity: 3T |
Pre-sale services:1) Provide the free consultation of the equipment2) Provide the standard device and the flow chart3) According to the clients' special requirement, offering the reasonable plan and free design to help to select the equipment.4) Welcome to visit our factoryServices during the sales:1) Inspect the machine before leaving the factory.2) Oversea install and debug the equipment3) Train the first-line operator.After sale services:1) 24 hours online service2) Provide the video with Install and debug the equipment3) Provide technical exchanging