NAME | MODEL | QUANTITY |
BLOWING MACHINE | GMS-5G | 1set |
Inside heater | | 1set |
ASSIT MACHINE |
AIR COMPRESOR | 1.6M³/3.0Mpa For Supply Pressure Air | 1set |
AIR TANK | 0.3M³/3.0Mpa For Supply Pressure Air | 1set |
AIR COOLING DRYER WITH AIR FILTER | 2.0 M³3.0MPA For Cooling And Dryer Pressure Air | 1set |
AIR PIPE AND FITTING | STANDAR For Connect Machine | 1set |
WATER CHILLER | 3HP | 1set |
BOTTLE MOULD FOB LS-B20L |
Bottle blowing mould | 5 gallon 1-cavity 55mm neck 45#steel | 1set |
Business Item:
If the Buyer agrees to buy the above-mentioned goods, all the business item will be according to the terms and conditions as stipulated below, these goods will be exported by exporting company belonged to seller, which referred in the following:
Guarantee time: One year from the machine is running in buyer's workshop.Packing: PE film with wooden pallet under machineShipping Marks:Port of Shipment: Shanghai,ChinaPort of Destination:Delivery time: 50 days after receipt of deposit.Terms of payment: T/T 30% payable as deposit, the other shall be paid before shipment.Beneficiary,Bank of Account & Number of Account:INSTALLTION, COMMISSIONING AND TRAINING
After-sales service
Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general
layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation
work, e.g. electricity supply, water supply operators and cranes, etc.
b. we will prepare for visa application for their engineers, who are responsible for guide of
machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The
buyer is also responsible to bear expenses generated, e.g. visa formalities, meals,
accommodation and allowance of USD100 per day for each engineer.
d. Engineer will give free training lessons to operators in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer within 4 months from
the date of the bill of lading, which to be accounted all the machines has been successfully tested by
buyer.
SPARE PARTS AND INSTRUCTION MANUAL:
The quotation are including the all necessary spar parts for 1 year operation.
One set of instruction manual (operator manual, maintenance manual, installation instruction, electrical circuit diagram and spare parts catalogue) will be delivered together with each machine.