Timber Beam Formwork with Shifting Trolley for Slab Construction

China Timber Beam Formwork with Shifting Trolley for Slab Construction, Find details about China Deck Formwork, Table Formwork System from Timber Beam Formwork with Shifting Trolley for Slab Construction

Model NO.
Slab formwork
Color
Yellow, Blue or Customized
Length
3300~5000 mm
Width
2440~3600 mm
Bearing Capacity
5~15kn/Square Meter
Auxiliary Equipment
Lifting Fork, Shifting Trolley
Transportation
by Trolley or Crane
Standard Size
2440*4880mm and 3300*5000mm
Certificate
ISO9001
Trademark
LIANGGONG
Transport Package
Steel Pallet or Customized
Specification
Customized
Origin
China
Model NO.
Slab formwork
Color
Yellow, Blue or Customized
Length
3300~5000 mm
Width
2440~3600 mm
Bearing Capacity
5~15kn/Square Meter
Auxiliary Equipment
Lifting Fork, Shifting Trolley
Transportation
by Trolley or Crane
Standard Size
2440*4880mm and 3300*5000mm
Certificate
ISO9001
Trademark
LIANGGONG
Transport Package
Steel Pallet or Customized
Specification
Customized
Origin
China

Product Description

Table formwork
Flexible and fast slab formwork

Table formwork is a kind of formwork that used for floor pouring , used widely in high-rise building , multi-level factory building , underground structure etc. During the construction, after the pouring completion, table formwork sets can be lifted by lifting fork to an upper level and reused, without need to dismantle. Compared with the traditional formwork, it is featured by its simple structure, easy disassembly, and being reusable. It has eliminated the traditional way of slab support system, which consists of cuplocks, eel pipes and timber planks. The construction speeds up obviously, and manpower has been saved greatly.Products Show  
 
Timber Beam Formwork with Shifting Trolley for Slab Construction
Timber Beam Formwork with Shifting Trolley for Slab Construction
Timber Beam Formwork with Shifting Trolley for Slab Construction


Characteristics

Standard unit of table formwork
Table formwork standard unit has two sizes: 2.44 × 4.88m and 3.3 × 5m .The structure diagram is as follows:


Timber Beam Formwork with Shifting Trolley for Slab Construction
Table formwork guardrail
The guardrail can be set at the edge of floor as needed, shown in the figure:

Timber Beam Formwork with Shifting Trolley for Slab Construction
Lifting fork
The lifting fork for table formwork is used for lifting of the table formwork unit, which allows the overall transportation of the large-area table formwork, greatly improving the work efficiency and saving time. There are currently two main types of lifting fork s as shown:


Timber Beam Formwork with Shifting Trolley for Slab Construction
Lifting fork operation chartTimber Beam Formwork with Shifting Trolley for Slab Construction
Shifting Trolley

The shifting trolley is used for the overall transportation of the formwork in the horizontal direction.
Timber Beam Formwork with Shifting Trolley for Slab Construction

Trolley application diagram
Timber Beam Formwork with Shifting Trolley for Slab Construction

Packing & Delivery
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Our Company
Timber Beam Formwork with Shifting Trolley for Slab Construction
Timber Beam Formwork with Shifting Trolley for Slab Construction
FAQ
Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
        If you have another question, please feel free to contact us !