Offer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei Mould

China Offer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei Mould, Find details about China Storage Box Mould, Household Plastic Mould from Offer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei Mould

Application
Commodity, Home Use
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
TS16949, ISO9001,SGS
Standard
HASCO
Customized
Customized
After-sales Service
24 Hours
Trademark
Hongmei
Transport Package
Wooden Case
Specification
Depends on Customer′s Requirements
Origin
China
HS Code
8480719090
Application
Commodity, Home Use
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
TS16949, ISO9001,SGS
Standard
HASCO
Customized
Customized
After-sales Service
24 Hours
Trademark
Hongmei
Transport Package
Wooden Case
Specification
Depends on Customer′s Requirements
Origin
China
HS Code
8480719090

Product pictures and Description

Offer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei Mould
Offer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei Mould
Mould NameStorage Box Mould
Mold meterialP20,2738,718H,NAK80,2316,S136,H13,etc
Mold baseSelf-mad:LKM:DME
runnerCold runner and hot runner
Hot runner brandChinabrand:HASCO:YUDO and so on
Degsin softwareUG:Aoto CAD and so on
Mold life50-500 million Shots/ 5-6 years, Even in 10 years in good maintenance
T1 time45-60 days
packageWooden Case
Plastic materialPP PC ABS PET PE PVC PMMA TPR PA6,PA66,ASA,POM,PPS,ABS,ABS+GF,ABS+PC,POM(Derlin)
Warranty period1 year or 1 million shot times(in this period, if the mold have problem,
 we will offer the parts or service by free, but not include the problems cased by wrong operation)
Mould Precision+/-0.01mm
Mould CavitySingle Cavity, Multi-cavity
Gate TypePinpoint Gate, Edge Gate, Sub Gate, Film Gate, Valve Gate, Open Gate, etc.
Mould Surface TreatmentEDM, texture, high gloss polishing
Quality SystemISO9001,SGS,TS16949
HS code8480719090
OriginMade in China
Installationfixed
CavitySingle/multi
SpecificationDepends on customer's requirements
Mold cooling systemwater cooling or Beryllium bronze cooling, etc.
Mold hot treatmentquencher, nitridation, tempering,etc.


Hongmei Mould established in 2014 and specialized in making various plastic injection moulds. Hongmei company is located in Huangyan District, the beautiful "town of molds" in Zhejiang Province, China. It is convenient that it will take 30 minutes from Luqiao airport and 10 minutes from Taizhou railway station. Hongmei company specializes in developing all kinds of large-scale injection molds, especially in making automotive, home appliances and daily necessities molds, at the same time we provides one-stop service for mold semi-finished products processing. Our company cover an area of 5000 square meters and employee 86 workers which are skillfully.
Our Main Product
1.Household parts mould
2.Appliance parts mould
3.Automotive parts mould
4.Thin-wall parts mould
5.Industry parts mould
Our Equipment
Five-axis high-speed milling machines
Three-axis high-speed milling machines
CNC milling machines
Deep hole drilling machines
Large-scale milling machines
CNC engraving machines
Electric sparks (EDM)
wire cutter
These machines enable us to manufacture large-size moulds, complex moulds, deep cavity moulds, thin-wall moulds and high-precision moulds. The concept of high-quality, high-precision, high-tech, high-service-driven development continues to create miracles.

We anticipate your presence sincerely.

Offer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei MouldHongmei Mould knowledge and experience to share and discuss with customers, puts forward technology forward ideas, participates in customer product design, we will timely pass on product structure design, product mold manufacturability, mold drawings and 3D to customers, give customers a direct view, inform customers about product design opinions, mold manufacturing ideas, and shoulder to shoulder with customers to avoid development risks.
In many stages of project development, project personnel and technical designers discuss design, development and manufacturing in strict accordance with project management methods, in order to provide customers with the most perfect solutions and ensure that the quality of project development exceeds customer requirements.

Offer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei MouldHong Mei Mould Plastic will provide customer flow analysis, and use simulation software to verify the basic details of filling process, dissolution wiring, deformation and other die design. These characteristics will define the high quality of the die to ensure the accuracy of the initial stage of the project, so as to ensure the success at T1.
We provide a full range of processing technology, up to five axis.
The software is suitable for all 2D, 3D and five axis programming.
The machine is equipped with automatic tool changer and laser calibration tool.
The high-speed machining center is equipped with automatic detection function of workpiece off the machine.

Offer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei MouldProduct design inspection:
Whatever product design made by HONGMEI MOULD or offered by customers, we always make all round analysis and inspection, such as Plastic Mouldsing process feasibility, Plastic Moulds structure and movement feasibility, all the related plastic components matching situation, etc. It can avoid Plastic Moulds amendment, scrap and other unnecessary Plastic Moulds repair work, which are caused by product design fault. We believe that 10 more minutes we spend on the design, one month may be reduced in production.
With precise analysis, foreseeing rationality analysis for Plastic Moulds design, best processing analysis and Plastic Moulds structure application, it offers the most professional solutions with the most suitable Plastic Moulds performance and technical specification as customer required.
The inspection covers many aspects, such as Plastic Moulds intensity, mold-flow analysis, Plastic Moulds ejection, cooling system, rationality of guiding system, application of Plastic Moulds spare parts' specification, customers' machine selection and special requirement application, etc. All of these should be inspected in according with HONGMEI MOULD Plastic Moulds design standard.
Steel purchasing inspection:
There is strict inspection process and time control of spare parts purchasing, the parts' standardization, size precision, hardness of Plastic Moulds material and material flaw detection and so on.
Mould manufacture is not only mould design,CNC processing and assembly. A good mould company not only concern on this, they will pay more attention to the detail things like mold flow , mould size check, mould CNC precision, water channel check and mould polish degree.
Inspection Equipment
1. sliding caliper
2. Multimeter
3. Hardometer
4. Measure tape
5. Micrometer calipers
6. CMM machine
Appearance Inspection Standards
1. Mould base size should be standard
2. Tidy and smooth of the mould base surface
3. Mould steel must be the same as the contract
Mould Structure
1. Reasonable mould structure
2. The slides must smooth and need heating treatment,there is a oil groove on the slide
3. Lifter, insert and injection pin,bush should be operate smooth.
Cooling System
1. Reasonable cycle cooling system
2. Smooth water channel, no leak water and air
3. The interface size of the water channel should be the same as the drawing
Injection System
1. Locate ring should be suit for the injection machine, main runner size and slope should be design reasonable
2. Feeding method and branch runner should be reasonable position, the gate is easy for falling off
3. Parting Line design reasonable
4. Some mould marked date of day/Month/Year or material or logo
5. Injection Pin should be design suitable
Processing quality control:

Offer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei MouldControl the size precisely, make self-inspection on each tooling spare parts in according to the requirements of drawing size and tolerance limits control. Only pass the inspection, can the spare parts delivered to the next working step. It is not allowed to make previous wrong work pieces inflow to the next tooling steps. For CNC milling, it needs strict auditing for procedures before tooling. After tooling, we will check up and control the precision by 3D coordinate measures. We have many measures: professional tooling technology training and machine maintenance; self-inspection of tooling workpiece and acceptance check made by quality department; rational work shifts system and tooling control system.

Quality inspection of plastic moulds installation:
Make complete inspection on Plastic Moulds to ensure the structure consistence and spare parts standardized. Project manager and QC people should all take part in Plastic Moulds inspection under the company standard, and make sure the product quality. If mistakes are found, they can be corrected promptly. It also can prevent mistakes. In addition, we will simultaneously do independent standardization test on Plastic Moulds cooling system, Plastic Moulds hydraulic oil channel system and hot runner system.

Acceptance inspection on sample dimensions and plastic moulds size:
QC department should make product inspection and submit the test report within 24hours after Plastic Moulds testing. Report should include full range test and analysis on product size, appearance, injection techniques and Physical Parameter. We use different inspection standard and tool for different products. In our labs, we do different test on high pressure injection, high speed injection, long time automatic running testing, and so on. QC department gives suggestions on the amendment and improvement for rejected product. We have accumulated abundant experience, which applies in Plastic Moulds production and offer good solutions for more and more customers. Along with our continuous improvement on equipments and measuring and test instruments, our product inspection tends to be more professional.


Mold processing
After the confirmation of the mold drawing, start to make,including steel preparation, CNC rough machining, deep hole drilling, EDM, drilling machine, high-speed milling, finishing, assembly, etc.
All of our mould steels in our company have long service life . The moulds are manufactured with advanced equipment, with a tolerance of + / - 0.01mm. The appearance of die products is good without flash, and they are well matched with other products.
Efficient equilibrium cooling system
High precision machining process
Careful selection of the steel for every part of the mold
The mold adopts the hot runner with valve gates to improve mold efficient
Offer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei Mould

Plastic mold design &test
Testing of plastic moulds:
To a certain extent, we test the mold only to find out the problems existing in the mold, not to solve them. Therefore, the mold test is divided into several steps, including empty running, high pressure holding, high-speed injection and related long-time mold running detection.
We'll test the mould again after polishing,then send customer the final sample and video of mould test to confirm.
Through the accurate analysis of mold design, processing steps and plastic mold structure, we provide a perfect solution for customers.Mold inspection involves many aspects, such as: mold strength, mold flow analysis, mold injection, cooling system, guide system, specifications of various parts, customer machine selection and customer special mold requirements, etc., all of which should be tested according to the mold design standard.

Offer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei Mould
Mould Manufacturing Culture and service
HongMei mould manufacturing culture is particular. We believes that if we do everything based on RESPONSIBILITY, all thing are well done. Thus, our Mold Manufacturing core culture is responsibility.
HongMei Mould has so many important points and all of them must be well done during the mold manufacturing. The action included:
-Inquiry from customer before mold manufacturing.
During this processing, the communicators of both sides should offer the correct information or specification to be sure that the pricing and technical points are meeting buyer's requirements.
-During the Manufacturing, the designer needs to be responsible to make the mold design. This responsibility is to customer and to company too, he has to consider how the customer use this mold, how to design the mold into long life tool, how to design the related components to make it easier tooling during the Mold Manufacturing and higher precision.
-Mold components machining during the Mold Manufacturing.
The machine operators with strong responsibilities, then the mold components can be precise enough to meet the drawings tolerance requirements. Here the responsibilities are indicated by careful steel installation, rigorous machining process following and rigorous dimension controlling during and after the machining. Otherwise, the errors will extend to the next processing. This will cause the terrible delaying on the mold shipment.
-Mold components dimension controlling after the machining. During the Manufacturing, the cavities, cores and other mold components, after the machining, they need serious dimension controlling. CAM team is responsible to be sure that all the dimensions are according with the drawings.
And Mold assembling workshop, mold mass production simulation workshop, all of them they need to be responsible to be sure that the Mold Manufacturing is successful and the delivered mold is top quality according with HongMei Mould standard.

Offer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei Mould
Mould shipment Details
- Quality inspection of plastic mold installation:
Complete inspection of plastic mold to ensure the continuity of mold structure and the standard of parts. The project manager and quality inspection personnel shall inspect the plastic mould according to the company's standard, so as to ensure the quality of the products. Once the problem is found, it can be corrected immediately, and effectively prevent the occurrence of errors. In addition, we continuously test the cooling system, hydraulic oil duct system and hot runner system of plastic mold
Checking before mould delivery
1. After confirming the sample of customer, our manager will inform our team leader to check the mould. Including the 3d mould design, customer's requirements and mould trial problem.
2. Our inspector will according the files above to check the mould.
3. If our customer need the water channel drawings and oil channel drawings, we will print for you, of course we could provide mould water transport pictures.
4. After all the detailed checking no question, then we will inform our team leader to packing the mould.
- Mould specification
1. Team leader will fill in the instruction
2. Packing all the mould accessories into a wooden case
3. Prepare mould trial report, mould using instruction, mould temperature control box instruction and quality certification to customer.
- Mould Packing
1. Cleaning the cavity and core, no iron filings
2. Spraying the antirust paint inside and outside
3. Wrapped with the plastic film
4. Putting into a wooden case or wooden pallet

Offer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei Mould
Hongmei Mould Company Advantage
- Free Design: Including part design and mould design
- Service: 24 hours on line service
- Equipment: Five-axis high-speed milling machines
Three-axis high-speed milling machines
CNC milling machines
Deep hole drilling machines
Large-scale milling machines
CNC engraving machines
Electric sparks (EDM)
wire cutter


Offer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei MouldOffer High Demand Injection Mould for Plastic Storage Box Mould From Hongmei Mould
FAQ

Q: Are you mould factory?
A: Yes, Hongmei company is established in 2014 which specialized in making injection mould.

Q: What kind of mould you can make?
A: Plastic injection mould,mainly including household part mould, appliance shell mould, thin wall part mould, auto motive part mould, industry part mould, pipe mould and pet preform mould.

Q: What about your payment terms?
A: 50% prepayment in advance, and the balance should be paid before shipment.

Q: How long to finish a mould?
A: Mostly will be finished in 45 days, but some complex and big mould will spent more time.

Q: How's annual output of your company?
A: We can make 300-500 sets each year.

Q: How long of the mould warranty period?
A: The mould warranty period for 1 year(Damage caused by human factors or accident are not within the the scope of warranty), and wearing parts will send to you for free.

Hongmei company will customize the mould for you to save time and money. We are looking forward to cooperating with you! Good after sales service! Your satisfaction is our pursuit!

Welcome you inquire us!Further Information Contact us!