China Professional Factory Quality Plastic Water Meter Box Mould, Find details about China Plastic Water Meter Box Mould, Water Meter Box Mould from Professional Factory Quality Plastic Water Meter Box Mould
Product Name | Professional Factory Quality Plastic Water Meter Box Mould |
Product material | PP/PE |
Core&Cavity Steel | p20,H13,718,2738 |
Steel hardness: | HRC34-38 |
Mould Standard | DME,HASCO,LKM etc |
Cavity Number | single |
Injection System | cold runner direct gate |
Ejector System | ejector pin |
mould base | S50C/c45 |
Cycle Time | 300-500S |
Tooling lead time | 60DAYS |
Mould life5 | 500,000SHOTS |
Quality assurance | ISO9001 |
Specification | According to client's requirements |
Our Advantage | 1.High quality |
2.Reasonable price | |
3.On time delivery | |
4.Good After-sale service | |
5.Strict quality control | |
6.All the mould are automotic. | |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule | |
In-time mould test and sample delivery | |
In-time mould delivery. |
1. Samples/Drawing & Requirement from you | |
2. Mould design: we will Communicate& Exchange the opinion with you after you place order. | |
3. Material Purchase: Steel cutting and Mould base tooling. | |
4. Assembling. | |
5. Inspection of mould: following and controlling the tooling processing. | |
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! | |
7. Your instruction & confirmation for shipment. | |
8. Ready made mould before packing. |