China High Quality Plastic Mould PVC Drain Stainless Steel Cavity and Core

China High Quality Plastic Mould PVC Drain Stainless Steel Cavity and Core, Find details about China Plastic Mould, Mould from China High Quality Plastic Mould PVC Drain Stainless Steel Cavity and Core

Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
ISO
Standard
DME
Customized
Customized
Trademark
Win Win Mold
Transport Package
Crate/Pallet
Origin
China
HS Code
8480719090
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
ISO
Standard
DME
Customized
Customized
Trademark
Win Win Mold
Transport Package
Crate/Pallet
Origin
China
HS Code
8480719090
1Mo
uld Base
LKM, DME, HASCO etc ;
2Cavity Material1.2738,1.2343, 1.2344, S7, H13, P20HH, GS738H, LKM738H, 718, 8407, S136, Calmax 635 NAK80,  
SKD-61,NIMAX, 45#, 50#, Aluminum for prototype mold etc.
3Steel Hardness20-60HRC
4TreatmentPre-Harden, Nitride, Heat treatment, Quenching
5Cavity QtySingle-cavity / Multi-cavity
6RunnerCold runner or Hot runner :YUDO/ HUSKY/MOLD-MASTER/SYNVENTIRE/INCO/ MASTIP/ HASCO/ DME
7GateSubmarine gate, tunnel gate, side/edge gate, direct gate, pin point gate, sprue gate, diaphragm gate, fan gate, cashew gate, hook gate, hot tip, hot drop, valve gate etc.
8Plastic material for partsPS, SAN, PA, POM, ABS, PP, PET, PC, PE, HDPE, PA66+GF, PVC, TPE, TPU, TPV etc
9Mould Life50K - 1 million cycles
10Design SoftwareUG, CAD, PRO-E, Solid Works etc,
11ProcessCNC, high speed carve, EDM ,wiring-cutting, drill, polish etc
12QualityISO9001:2000 Certified
13Lead Time10-30 work days depends on the structure and size of products
14PackageWooden Case Package or according to customer requirement
15Price TermEX Works, FOB Shenzhen, FOB Hong Kong, China, CFR, CIF, DDU, DDP
16PaymentT/T, Western Union , Money Gram
1720 years professional manufacturing experience, specialized in design and manufacture of plastic injection mould ( tooling) for Automotive, Electrical appliances ,House wares , Medical devices, Toys and Games, Communication industries and etc.
18 OEM & ODM orders are welcome.



Win Win Mold was founded in 2006. With many years of development, it has grown up to an enterprise providing a full "turn key" services to the customers, starting with product design, prototype parts making, mold design, mold making and molding production, automotive checking fixture etc. Moreover, we are specialized in plastic injection mold designing and manufacturing. 

Win Win Mold builds a wide variety of Plastic Injection Molds, ranging in size from small M. U. D. Inserts to molds of 15 tons; Single cavity to multiple cavity; Proto-type to high production class 101; Standard runner/gates to hot manifolds with valve gates. 

Multi-Cavities Molds

2-Shot / Multi-Material Molds

Over Mold

Unscrewing Molds

Insert Molds

Stack Molds

Cold Runner, 3-Plate, Semi-Hot, and Full Hot Runner Molds

Rapid Prototyping Molds

Large size molds

Gas Assist Molds

Die Casting tools

Automotive Checking Fixture


We provide molds and products to customers from a diverse range of industries including Automotive, Household electrical appliances, Electronics, Medical, Packaging, Telecommunications and Industrial tools. 

Let Win Win team support you to make your next project and every project a success!

 

Quality molds begin with quality design!

Engineering Capability
 

Win Win Mold's engineering team is using international advanced CAD/CAE/CAM design and processing integration system. Our engineers collaborate closely with our customers on all aspects of the programs so as to develop the best designed molds and that are easy to maintain and plastic components that are cost-effective to produce.


China High Quality Plastic Mould PVC Drain Stainless Steel Cavity and Core

In order to offer customers the molds and products with good quality and better lead time, we set up the project management process.
After new project input, project manager with project engineer will get involve in the project process, work with engineering team to provide customer DFM report, Mold Design.
During manufacturing period, we will keep customer updated with
Weekly Progress Report containing detailed pictures. After T1, mold trial report and samples dimensional report will be supplied. For mold trials and final trial before mold shipping, engineers will check the mold according to checklists to ensure mold can run well at customer's side after mold shipping.



China High Quality Plastic Mould PVC Drain Stainless Steel Cavity and Core

Manufacturing Capability

China High Quality Plastic Mould PVC Drain Stainless Steel Cavity and Core

Manufacturing Capability
China High Quality Plastic Mould PVC Drain Stainless Steel Cavity and Core

Quality

Quality is of the utmost importance as quality molds yield quality parts.
 
Win Win Mold is sparing no effort on each process to ensure the quality.
1. Mold Design Control 
2. Mold Steel Hardness Inspection 
3. Mold Electrodes Inspection
4. Mold Core and Cavity Steel Dimension Inspection 
5. Mold Pre-Assembly Inspection 
6. Mold Trial Report and Samples Inspection 
7. Pre-Shipment Final Inspection 
8. Export Product Package Inspection
 
We are confident that our QA team will ensure the quality of your projects with the
newest manufacturing and inspection equipment. We guarantee our tooling will meet
tough tolerances and will consistently deliver quality parts with the shortest cycle time.


China High Quality Plastic Mould PVC Drain Stainless Steel Cavity and Core

Plastic Injection Molding Production
 

On-site injection plastic mold repair & maintenance

Injection machines ranging from 80 - 600 tons

24-hour plastic molding manufacturing shifts

Long and short plastic injection molding 
    production runs

Insert molding, dual-color molding service
General resin and industrial plastic such as ABS, 
    PP, PE, HDPE, LDPE, PC, PC+ABS, POM, PMMA, 
    PA66+33%GF, PPT, PVC, etc. 

 

Win Win  Mold is a full service Plastic Injection Molding manufacturer in custom manufacturing. With our experienced tool makers and setters we can achieve optimum product output in a minimum of time. Your product is molded to your specifications and put through our quality inspection department to guarantee accuracy and quality at all times.


China High Quality Plastic Mould PVC Drain Stainless Steel Cavity and Core

FAQ: 

Q. I have an idea for a new product, but I don't know if it can be manufactured. Can you help?
A. Yes! We are always happy to work with potential customers to evaluate the technical feasibility of your idea or design and we can advise on materials, tooling and likely set-up costs.


Q. What are the advantages to have my parts manufactured locally?
A. Win Win  Mold can offer quick reaction times to any changes in specification, batch size or material. We can ship small or large quantities anywhere in North America, Europe overnight to accommodate unforeseen changes in demand.


Q. My components have already been developed on CAD. Can you use the drawings?
A. Yes! DWG, DXF, IGES, Solid works and STP, X_T files can all be used to generate quotes, models and mould tools - this can save time and money in producing
your parts.


Q. Can I test my idea/component before committing to mould tool manufacture?
A. Yes, we can use CAD drawings to make Prototype models for design and functional evaluations or market test.


Q. What type of plastic is best for my design/component?
A. Materials selection depends on the application of your design and the environment in which it will function. We will be happy to discuss the alternatives and suggest the best material.

 

Q. What type of mould tool do I need?
A. Mould tools can be either single cavity (one part at a time) or multi-cavity (2,4, 8 or 16 parts at a time). Single cavity tools are generally used for small quantities, up to 10,000 parts per year whereas multi-cavity tools are for larger quantities. We can look at your projected annual requirements and recommend the 
best tooling option for you.

 

Q. Ok, I've decided to go ahead with my project. How long will it take to get my parts?
A. It can take 3 to 6 weeks to have the mould tool manufactured depending on the part's complexity, size and the number of impressions/ cavities (single or multiple). After we receive your final approval on the tool preliminary design, you can expect delivery of T1 parts within 3-6 weeks. And during mold building process, mold build Weekly Update will be provided to you every week for your better understanding of the manufacturing progress in our work shop.