China Electricity Generation 10kVA 15kVA 20kw 30kVA Power Open/Silent Diesel Generator, Find details about China Diesel Engine, Power Diesel Generatoring from Electricity Generation 10kVA 15kVA 20kw 30kVA Power Open/Silent Diesel Generator
GENSET SPECIFICATION | |
Model | YN-20GF |
Rated Power | 20 KW |
Rated Voltage | 400 V / 230 V |
Rated Current | 36 A |
Power Factor | 0.8 |
Rated Frequency | 50 HZ |
Rated Revolution Speed | 1500 RPM |
Starting Mode | DC12V Electic Start |
Overall dimensions | 1500*700*750 (L*W*H mm) |
Net Weight | 320 KG |
Connection Mode | Three Phase Four Wire |
ENGINE SPECIFICATION GENERAL PERFORMANCE | |
Engine Brand | Changxing |
Power | 20 KW |
Engine Mode | CX25 |
Cylinder | 1 l |
Starting Mode | Electric Starting |
Intake Type | Natural |
Rated Fule Consumption | 3.8 L/H |
Direction Of Rotation | Anticlockwise |
Cooling Type | Water Cooling |
Rated Revolution Speed | 2200 RPM |
ALTERNATOR DATA | |
Alternator Brand | Shanghai Yujie / Stamford |
Alternator Mode | STC-20 |
Rated Power | 20 KW |
Rated Voltage | 400 V / 230 V |
Power Factor | 0.8 |
Insulation Class | B |
Voltage Regulation | ≥ ± 5% |
Output Frequency | 50 HZ |
Connection Mode | Three Phase Four Wire |
· After-sales:
Once receive any feedback of quality problem we will respond at the first time, and solve the problems within 24 hours.
· Guarantee:
Warraty period is one year or 1000 hours (depends on which occurs first ). If the failure is caused by turbine manufacturing defects.
we will be responsible for problems caused by quality of production or raw material, except the damageable spare parts of genset caused by crew wearing parts, consumable parts for daily use, human error , negligence or failure of following the original maintenance manual provisions, etc
1. What certificate do you have for generator diesel ?
There are ISO 9001,ISO 14001,CE etc.
2. What is your MOQ, payment method, delivery time?
Our MOQ is only 1 set. Payment method usually is 30% T/T as deposit, 70% balance T/T before delivering,or use trade assurance and L/C.
Delivery period normally will be 7~15 days after receiving customers' deposit.
3. Which port do you often use when export?
Qingdao,Tianjin,Shanghai,Guangzhou or as customer request.
4. Is there any spare parts you can provide along with generators to make the maintenance convenient?
We can provide regular engine's air filter, fuel filter, oil filter to customers for self-maintenance.